My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-10-09_PERMIT FILE - M2025030
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2025030
>
2025-10-09_PERMIT FILE - M2025030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2025 3:54:53 PM
Creation date
12/22/2025 3:51:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2025030
IBM Index Class Name
Permit File
Doc Date
10/9/2025
Doc Name
Adequacy Review Response
From
Mile Hi Rock and Minerals Society
To
DRMS
Email Name
ERR
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C - Mining Plan <br />Rule 6.3.3 (Starts on Page 136 of the Rules) <br />The purpose of the mining plan is to describe how mining will affect the permit area through duration of the <br />operation. The plan must be correlated to Exhibit E – Map. <br />1) Estimated dates of commencement: ___________ and completion: ___________ <br />2) How many years is the mine anticipated to be operational: ___________ years <br />3)Will mining activities occur all-yearlong or just seasonally when weather permits (check one): <br />(___) all-yearlong or (___) seasonally, explain: _________________________________________ <br />4) How many aces of the mine site will be disturbed at any given time: ___________ acres <br />5) Depth of topsoil to be salvaged (only for surface disturbances) (check one): <br />_____ 4-6 inches _____6-8 inches <br />_____ 8-10 inches _____10-12 inches <br />_____ Other: ______________________ <br />_____ N/A, explain: _______________________________________________________________ <br />6)Will you need to move any overburden (check one): ( ) Yes or ( ) No <br />a. If yes, approximately how thick is the overburden? ________________feet <br />7)How will the mine be accessed: ( ) existing roads ( ) new roads will be created <br />Please describe the existing roads: <br />______________________________________________________________________________ <br />_____________________________________________________________________________ <br />a.If there will be new roads or road improvements, please describe the new roads and road <br />improvements: <br />______________________________________________________________________________ <br />______________________________________________________________________________ <br />8)Will water be needed during the mining operation (check one): ( ) Yes or ( ) No <br />a.If yes, please describe the source of the water and how much water will be used during the <br />operation: <br />______________________________________________________________________________ <br />______________________________________________________________________________ <br />9)Will any water diversions or impoundments be constructed (check one): ( ) Yes or ( ) No <br />a.If yes, please describe the water diversions or impoundments: <br />______________________________________________________________________________ <br />______________________________________________________________________________ <br />10)Will any chemicals be used during the mining process (check one): ( ) Yes or ( ) No <br />a.If yes, please describe the chemical types and quantities to be utilized, chemical storage and <br />spill containment and emergency response plans for on-site spills. Plant operation details <br />should include tank capacities and operating solution volumes: <br />______________________________________________________________________________ <br />______________________________________________________________________________ <br />______________________________________________________________________________
The URL can be used to link to this page
Your browser does not support the video tag.