My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-10-13_PERMIT FILE - M2025030 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2025030
>
2025-10-13_PERMIT FILE - M2025030 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2025 3:54:53 PM
Creation date
12/22/2025 3:50:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2025030
IBM Index Class Name
Permit File
Doc Date
10/13/2025
Doc Name
Reclamation Cost Estimate
From
DRMS
To
Mile Hi Rock and Minerals Society
Email Name
ERR
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br /> <br />CIRCES Cost Estimating Software <br />WHEEL LOADER – LOAD AND CARRY WORK <br /> <br />Task description: Backfill Site Disturbances (40 CY Overburden, 7 CY Topsoil) <br />Site: RAMS HOME <br />Permit Action: M2025030 New <br />Permit Permit/Job#: M2025030 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 001 State: Colorado Abbreviation: None <br />Date: 10/10/2025 County: Teller Filename: M030-001 <br />User: ERR <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COST <br />Basic Machine: CAT 246C Horsepower: 73 <br />Attachment 1: ROPS Cab Shift Basis: 1 per day <br /> Data Source: (CRG) <br />Cost Breakdown: <br /> Utilization % <br />Ownership Cost/Hour: $44.05 NA <br />Operating Cost/Hour: $31.14 100 <br />Operator Cost/Hour: $59.52 NA <br />Total Unit Cost/Hour: $134.71 <br />Total Fleet Cost/Hour: $134.71 <br /> <br />MATERIAL QUANTITIES <br />Initial volume: 71 CCY Swell factor: 1.430 <br />Loose volume: 101 LCY <br />Source of estimated volume: Application (47 CY) + 50% Grading Volume (DRMS Approx.) <br />Source of estimated swell factor: Cat Handbook <br /> <br />HOURLY PRODUCTION <br />Loader Cycle Time: <br />Cycle Time Factors Factor (min.) Source <br />Material: Mixed material 0.02 0.020 (Cat HB) <br />Stockpile: No adjustment - factor not applicable 0.00 0.000 (Cat HB) <br />Truck Ownership: No adjustment - factor not applicable 0.00 0.000 (Cat HB) <br />Operation: Inconsistent operation 0.04 0.040 (Cat HB) <br />Dump Target: Small target 0.04 0.040 (Cat HB) <br /> Net Cycle Time Adjustment: 0.100 minutes <br /> Adjusted Basic Cycle Time: 0.525 minutes <br />Rolling Resistance – Road Conditions <br />Haul: Soft, rutted dirt, no maintenance or water, 4” tire penetration 8.0 <br />Return: Soft, rutted dirt, no maintenance or water, 4” tire penetration 8.0 <br />Haul and Return Time <br /> Length <br />(feet) <br />Grade Res. <br />(%) <br />Rolling <br />Res. (%) <br />Total Res. <br />(%) <br />Travel Time <br />(minutes) Source <br />Haul Route: 50 0.00 8.00 8.00 0.0476 (Cat HB) <br />Return Route: 50 0.00 8.00 8.00 0.0476 (Cat HB) <br />Unadjusted Basic Cycle Time (load, dump, maneuver): 0.425 minutes
The URL can be used to link to this page
Your browser does not support the video tag.