Laserfiche WebLink
3. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and <br /> redistributed for the re-establishment of vegetation. Specify approximate topsoil <br /> redistribution depth: <br /> Very limited topsoil as seen in accompanying photographs. Surface will scraped and <br /> stocKpIled when mucl pis are being excavate excavatea Any topsoil will be redistributed over the <br /> excavated areas at,prooection completion <br /> 4. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required <br /> abandonment procedures): <br /> The holes will be plugged and capped with 2 ft of concrete at ground level <br /> S. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be <br /> reclaimed (refer to Rule 3 and Rule 5 for specific reclamation performance standards). <br /> You may wish to contact the Division for closure specifications. <br /> The drill pad and mud pit areas will be scarified and reseeded upon completion. <br /> Form 2—Public File Page 9 of 14 <br />