Laserfiche WebLink
-4- <br /> 12. Primary future Post-minin land use check one): <br /> Cropland(CR) Pastureland(PL) General Agriculture(GA) <br /> Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) Recreation(RC) Industrial/COlnmercial(IC) <br /> Developed Water Resources(WR) Solid Waste Disposal(WD) <br /> 13. Primary nresent land use check one <br /> RCroplaiid(CR) Pastureland(PL) General Agriculture(GA) <br /> Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) Recreation(RC) tndustrial/Coâ–ºmnercial(IC) <br /> Developed Water Resources(WR) <br /> l4. Method of Mining: Briefly explain mining method(e.g. truck/shovel): Track hoe and front end loaders load <br /> raw material to conveyors or haul truck for delivery to processing plant_ <br /> 15_ On Site Processine: -Z Crushing/Screening <br /> 13.1 Briefly explain mining method(e.g.truck/shovel): <br /> Material is processed into specification aggregates using crushers, and screen plants <br /> List any designated chemicals or acid-producing materials to be used or stored within permit area: <br /> None <br /> 16. Description of Amendment or Conversion: <br /> If you are amending or converting an existing operation,provide a brief narrative describing the proposed change(s). <br />