Laserfiche WebLink
Exhibit G _ _ _ Water Information fcono <br /> as needed around the perimeter of the mined area to prevent <br /> run-on. The floor of the mine will be natural sand and gravel so <br /> any storm water will be retained on site and allowed to soak into <br /> the ground. <br /> ESTIMATED CONSUMPTIVE WATER USE <br /> Water used for processing and dust control will be obtained <br /> from a well that is approved for commercial/industrial uses . The <br /> annual consumptive uses of water for the Sasaki Pit are estimated <br /> to be: <br /> USES VOLUME <br /> Acre-feet <br /> Moisture Loss in Materials(150,000 tons)dry NA <br /> mine <br /> Dust Control 8.00 <br /> Water Surface Evaporation NA <br /> Total Consumption (Augmented) 8.00 <br /> SUBSTITUTE WATER SUPPLY PLAN <br /> No ground water will be exposed to the air, eliminating the <br /> possibility for evaporation from an open water body. Therefore, <br /> no Substitute Water Supply Plan (SWSP) is needed. Water will be <br /> obtained from Well #1408RR (WDID 02047949 - AUG Plan CCWCD GMS <br /> decree) <br /> 100-YEAR FLOODPLAIN <br /> No part of the property is within the 100-year floodplain of the South <br /> Platte River. <br /> 8 1/2 Enterprises LLC. December 9, 2025 <br /> Sasaki Pit <br /> 27 <br />