EXHIBIT E <br /> RECLAMATION PLAN AND TIMETABLE <br /> OVERVIEW <br /> The proposed future use of this site is general agriculture. <br /> The area will be mined to supply sand and gravel for the company <br /> projects with limited outside sales . It will be a dry mine with <br /> no mining in the water table. The plan is to use the land as <br /> crop land during mining and the backfilled area once that is <br /> complete using, clean imported inert material and on site over- <br /> burden and topsoil, leaving a shallow depression with 2H: 1V slope <br /> around the exterior. The following 3 Reclamation options may <br /> happen as the mine develops <br /> OPTIONS <br /> Option 1 - is the primary plan to backfill the mined area to <br /> within 10-12 feet of the existing surface and reclaim for <br /> agricultural uses . <br /> Option 2 - would only occur if there is not enough material <br /> to backfill the entire mined area. This could leave parts <br /> or all of the area unfilled, and leave 2 : 1 slope around the <br /> mined area from the current surface to the mined floor. <br /> This option would reduce the cost to reclaim the area if <br /> mining ended prematurely so the Division would not have to <br /> purchase material to complete backfilling. <br /> Option 3 - In the future, an opportunity may become avail- <br /> able to build structures on this site that would be used for <br /> commercial or residential purposes . This would entail <br /> installing the building foundations in the mined area before <br /> backfilling. Engineered slabs and foundations would be <br /> placed on the floor when mining reached its maximum depth <br /> and walls would be erected, so up to 3 levels would be below <br /> grade. Backfilling would then take place around the founda- <br /> tions as currently planned. This would have the advantage <br /> over normal construction since they would not have to dis- <br /> pose of the dirt removed when the foundations are dug. The <br /> amount of backfill material needed would be less than Option <br /> 1 because the foundations take up area that would have been <br /> filled. <br /> The site would then be resoiled and seeded temporally until <br /> construction begins on the above ground structures. This would <br /> 8 1/2 Enterprises LLC. December 9, 2025 <br /> Sasaki Pit <br /> 14 <br />