Laserfiche WebLink
City of Grand JunctionPage 4 of 6Unit ExtendedJob Hours Price PriceItem # Item Description Unit QuantityTArea 18G(3)1 Unclassified Excavation (CIP) CY 160 3.00$ 480.00$ 3 De-Compaction with Rome Disc AC 0.35 600.00$ 210.00$ 4 Drill SeedingAC 0.35 4,750.00$ 1,662.50$ 4 Hydraulic Growth Organics ($1,000/ton) AC 0.35 1,800.00$ 630.00$ 5 Rich Lawn 363 (1,040/ton) AC 0.35 1,450.00$ 507.50$ 6 Sulfur Flakes($800/1,000 lbs) AC 0.35 950.00$ 332.50$ 7 Lot 125 ($200/5 gallon bucket) AC 0.35 550.00$ 192.50$ Subtotal Area 18G(3)4,015.00$ UArea 191 N/ASubtotal Area 19-$ UESR Site1 Removal of interal lysimeter components 8 CY 20 180.00$ 3,600.00$ 2 Remove Lysimeter, break foundation, and bury (14.5'x14.5') 32 LS 1 12,500.00$ 12,500.00$ 3 Hydrseeding (Completing this when Hydroseeding 18C) AC 0.72 4,200.00$ 3,024.00$ 4 Removal of 8' Fence 120 LF 2400 8.00$ 19,200.00$ Subtotal ESR Site38,324.00$ V Miscellaneous Items1 Existing Monitoring Well P&A 36 (Total for all) EA 251,250.00$ 31,250.00$ 2 Remove Existing Electrical Poles (16 poles @ 60' tall) 60 (Total for all) EA 16 2,000.00$ 32,000.00$ 3 Hand Broadcast Seeding (at location of removal of existing poles) 8 AC 0.8 5,000.00$ 4,000.00$ Subtotal Miscellaneous Items67,250.00$ 4,396,548.00$ 923,275.08$ 5,319,823.08$ Indirect Costs (21%)TOTALTotal Reclamation ActivitesExhibit B: Improvements Cost EstimateUpdated: 12/2/2025