My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-11-18_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2025-11-18_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2025 10:06:26 PM
Creation date
12/1/2025 9:55:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
11/18/2025
Doc Name
Adequacy Review
From
DRMS
To
CC&V
Type & Sequence
TR153
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Physical Address: 1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 <br />Mailing Address: DRMS Room 215, 1001 E 62nd Ave, Denver, CO 80216 https://drms.colorado.gov <br />Jared S. Polis, Governor | Dan Gibbs, Executive Director | Michael A. Cunningham, Director <br /> <br /> <br /> <br /> <br /> <br />November 18, 2025 <br /> <br />Bjorn Meyer <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />Victor, CO 80860 <br /> <br />Re: Adequacy Reivew, Technical Revision No. TR153 <br /> Cresson Project, Permit No. M-1980-244 <br /> <br />Dear Bjorn Meyer, <br /> <br />On October 20, 2025, the Division of Reclamation, Mining and Safety received the Technical Revision TR153 <br />application for the VLF2 Phase 3 Stage B.1 Record of Construction Report. Pursuant to Rule 7.3.1(5), no <br />chemicals used in the extractive metallurgical process or toxic or acid-forming materials shall be placed in <br />constructed facilities until the Board or Office accepts the certification of the facility, or phase thereof, that <br />precedes placement. The following comments need to be addressed prior to the DRMS accepting the <br />submitted report: <br /> <br />Record of Construction Report <br /> <br />1. Section 3.2.1 - Structure Fill: The report states that no laboratory compaction testing was performed <br />on the structural fill and that density was achieved by placing the material with a method exceeding <br />past method compactions specifications, however, Section 2.2 – Site Grading, states that a CQA <br />monitor observed all subgrade preparation and Structural Fill placement during site grading to verify <br />it met the requirements of the Technical Specifications. Please clarify what the exact approved <br />specifications are for density and compaction of the structural fill and what methods the CQA <br />inspector utilized to ensure those specifications were met. <br /> <br />2. Section 3.2.2 – Soil Liner Fill: The report refers to Tables 7 and 8 for the SLF nuclear <br />density/moisture testing and SLF depth checks respectively and that 102 tests were performed for <br />each and had passing results. Table 7 shows a total of 103 tests with SLF-15-N failing and, it <br />appears, a passing re-test for SLF-15-RT. In the narrative portion of the report, please discuss failed <br />tests, the steps taken to remediate the issues (if necessary), and re-tests. Additionally, please include a <br />footnote in table 7 to define the test number identifier of “RT”. <br /> <br />3. Section 3.4 - Geomembrane Construction Quality Assurance: The report refers to Appendix I for the <br />specific QA results and specifically Appendix I.6 for pressure testing of fusion welds. Beginning on <br />Pg. 2 of the Appendix I.6 table, several failing tests were recorded on multiple days of fusion welds. <br />Please identify what remedial action was taken for welds that failed the pressure test and if those <br />welds were retested. In the narrative portion of the report, please discuss failed tests, the steps taken <br />to remediate the issues (if necessary), and re-tests. Additionally, please include an appropriate <br />annotation in the Remarks column on the Appendix I.6 table to clearly show tracking of failed tests <br />and associated re-tests. <br />
The URL can be used to link to this page
Your browser does not support the video tag.