Laserfiche WebLink
<br />P:\Projects\0106.071 2025 Resident\J-REPORTS\VLF2 P3 Stage B.1 <br />RoC Page 6 <br />1. INTRODUCTION <br />NewFields Mining Design & Technical Services, LLC (NewFields) was commissioned by the <br />Cripple Creek & Victor Gold Mining Company (CC&V), which is owned and managed by SSR <br />Mining Incorporated, to provide Construction Quality Assurance (CQA) for the construction of <br />the Valley Leach Facility 2 (VLF2) Phase 3 project. The project is located in Teller County, <br />Colorado, just east of the city of Cripple Creek. VLF2 is included in the Cresson Project, which is a <br />gold mining and ore processing facility comprised of surface mines, crushers, lined VLFs, gold <br />recovery plants, and associated infrastructure. The Cresson project was designed and <br />constructed to meet or exceed the requirements established by C.R.S. §34 32 101 et seq. and <br />regulations promulgated there under by the Mined Land Reclamation Board (MLRB). The work <br />associated with the Cresson Project is being performed under specific criteria established in <br />Amendment No. 10 of Permit Number M-1980-244, as approved by the MLRB. <br />This Record of Construction (ROC) report documents the CQA services for the VLF2 Project <br />through Phase 3 Stage B.1. The following ROC reports should be referenced for Phase 3 Stage B.1 <br />documentation that was completed during Phase 1, Phase 2A, Phase 2B, Phase 3A, and Phase 3B: <br /> “Squaw Gulch VLF Pregnant Solution Storage Area Project Final Report,” <br />submitted by AMEC in November 2014 <br /> “Squaw Gulch VLF Phase 1 (9,450’ to 9,500’ Bench) Final Report,” submitted by <br />AMEC in October 2015 <br /> “Squaw Gulch VLF Phase 1 (9,550-foot Elevation Bench to Completed Areas <br />Outlined on Figure 2) Final Report,” submitted by AMEC in January 2016 <br /> “Squaw Gulch Valley Leach Facility Phase 1 Completion Record of Construction <br />Report,” submitted by NewFields in October 2016 <br /> “Squaw Gulch Valley Leach Facility Phase 2A Part 1 Record of Construction <br />Report,” submitted by NewFields in July 2019 <br /> “Squaw Gulch Valley Leach Facility Phase 2A Part 2 Record of Construction <br />Report,” submitted by NewFields in September 2019 <br /> “Squaw Gulch Valley Leach Facility Phase 2A Part 3 Record of Construction <br />Report,” submitted by NewFields in July 2020 <br /> “Squaw Gulch Valley Leach Facility Phase 2B Part 1 Record of Construction <br />Report,” submitted by NewFields in September 2020 <br /> “Squaw Gulch Valley Leach Facility Phase 2B Part 2 Record of Construction <br />Report,” submitted by NewFields in November 2020 <br /> “Valley Leach Facility Phase 3 Stage A.1 Record of Construction Report Revision 1” <br />submitted by NewFields in May 2023 <br /> “Valley Leach Facility Phase 3 Stage A.2 Record of Construction Report Revision 1” <br />submitted by NewFields in January 2024