Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />VALLEY LEACH FACILITY 2 <br />PHASE 3 STAGE B.1 <br />RECORD OF CONSTRUCTION REPORT REVISION 1 <br />Prepared for: <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />Victor, CO 80860 <br /> <br />Prepared by: <br />NewFields Mining Design & Technical Services, LLC <br />9450 Maroon Circle, Suite 300 <br />Englewood, Colorado 80112 <br /> <br /> <br />NewFields Job No. 475.0106.071 <br />November 20, 2025