My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-11-25_REVISION - M1999004
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1999004
>
2025-11-25_REVISION - M1999004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2025 9:14:18 AM
Creation date
12/1/2025 8:31:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999004
IBM Index Class Name
Revision
Doc Date
11/25/2025
Doc Name
Request For Succession Of Operator
From
AMRIZE West Central Inc
To
DRMS
Type & Sequence
SO5
Email Name
JLC
AME
SMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13. STEWARDSHIP TRUST STIPULATION-- Lessor shall specify certain stipulations with respect to use of the <br /> surface if said surface is included in the Stewardship Trust prior to the issuance of this Lease. <br /> 14. MINING METHODS -- Only mining methods that will insure the extraction of the greatest possible <br /> amount of minerals consistent within the laws and with prevailing good mining practice shall be used. <br /> If during mining activities, rock of high sales value such as high quality moss rock is encountered, this <br /> rock shall not be diluted with less valuable rock and then sold for less than its market value. <br /> 15. OPERATION PLAN -- All plans for exploration and mining shall be submitted to Lessor for approval by <br /> Lessor before such operations begin. These plans will include, but not be limited to, location of <br /> additional roads, location of access points to the Leased Premises, and location of any cattle guards or <br /> gates. The mining of this quarry will be conducted in such a way as to minimize visual impact from <br /> Highway 115 by the leaving of a wall of in-place quartzite sandstone of at least fifty feet in width such <br /> as that remaining in the northeast portion of the existing quarry. Mining of the quarry floor will be <br /> conducted in such a way as to leave at least ten feet of competent sandstone overlying any shale, <br /> claystone or otherwise less competent rock that would be subject to erosion upon exposure. There <br /> shall be no mining in areas containing springs or wetlands. Plans shall include provisions for control of <br /> noxious weeds on all lands disturbed by the Lessee, and along all transportation corridors used by the <br /> Lessee within the Leased Premises. <br /> 16. ENVIRONMENTAL ANALYSIS -- Lessee shall comply with all applicable federal, state, and local laws, <br /> rules, regulations, permits, codes and ordinances, including the rules, regulations and requirements <br /> of the Colorado Division of Reclamation, Mining and Safety to identify and reduce adverse impacts to <br /> the environment, and the public health, safety and welfare. Prior to any surface occupancy on the <br /> Leased Premises, Lessee must perform environmental analyses that are required by any local, state or <br /> federal agency or regulation, including, but not limited to, the study of the impacts of the mining <br /> operation on wildlife, air, water, soil, or other biological resources. Lessor may require that Lessee <br /> submit the environmental analysis, including proposed mitigation plans, for review by Lessor before any <br /> exploration or mining begins. <br /> 17. RECLAMATION -- Lessee shall submit all plans for restoration and reclamation of Leased Premises to <br /> Lessor for Lessor's approval before submitting the appropriate permit or permits pursuant to the <br /> Colorado Mined Land Reclamation Act 34-32-101 ET SEQ., C.R.S. 1973 as amended. Rules and <br /> regulations as set forth by the Division of Reclamation, Mining, and Safety for recovery and restoration <br /> of mined land will apply where applicable to the Leased Premises. Variations from the reclamation <br /> plan as originally submitted to the Board for approval may be granted only with the written approval of <br /> Lessor. <br /> 18. LESSOR'S APPROVAL -- Whenever approval by Lessor is required or contemplated by Lessee, approval <br /> must be in writing and shalt be optional and shall be within the sole and absolute discretion of Lessor. <br /> 19. OTHER STATE AGENCIES -- Lessor may determine that instruments and documents required by other <br /> State agencies satisfy certain requirements of this lease. In the event that Lessee is required to file <br /> instruments and documents with other State agencies, including the Division of Reclamation, Mining, <br /> and Safety, Lessee shall notify Lessor of said filing and Lessor reserves the right to request and obtain <br /> copies of such instruments and documents from the agency or from Lessee. <br /> SM 102453 <br /> Page 6 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.