Laserfiche WebLink
T - <br /> ek1ab YfC Receiving Check List <br /> Environmental Laboratory hap://www.teklabinc.com/ <br /> Client: Missouri Cobalt(US Strategic Metals) Work Order: 25040027 <br /> Client Project: Idaho Springs Gold Ore (Colorado) Report Date: 07-Apr-25 <br /> Carrier: LISPS Received By: JMD <br /> Completed by: Reviewed by: <br /> On: • On: J f��r t L <br /> 01-Apr-25 01-Apr-25 <br /> Laura E Henson Ellie(]Hopkins <br /> Pages to follow: Chain of custody 1 Extra pages included 0 <br /> Shipping container/cooler in good condition? Yes 0 No❑ Not Present ❑ Temp°C na <br /> Type of thermal preservation? None 0 Ice ❑ Blue Ice ❑ Dry Ice ❑ <br /> Chain of custody present? Yes 0 No❑ <br /> Chain of custody signed when relinquished and received? Yes ❑ No 0 <br /> Chain of custody agrees with sample labels? Yes 0 No❑ <br /> Samples in proper container/bottle? Yes 0 No❑ <br /> Sample containers intact? Yes 0 No❑ <br /> Sufficient sample volume for indicated test? Yes 0 No❑ <br /> All samples received within holding time? Yes 0 No❑ <br /> Reported field parameters measured: Field❑ Lab ❑ NA 0 <br /> Container/Temp Blank temperature in compliance? Yes 0 No❑ <br /> When thermal preservation is required,samples are compliant with a temperature between <br /> 0.1°C-6.0°C,or when samples are received on ice the same day as collected. <br /> Water—at least one vial per sample has zero headspace? Yes ❑ No LI No VOA vials 0 <br /> Water-TOX containers have zero headspace? Yes ❑ No❑ No TOX containers 0 <br /> Water-pH acceptable upon receipt? Yes ❑ No❑ NA 0 <br /> NPDES/CWA TCN interferences checked/treated in the field? Yes ❑ No❑ NA 0 <br /> Any No responses must be detailed below or on the COC. <br /> Date/time per Craig Hall. LH 4/1/25 <br /> Page 8 of 8 <br />