Laserfiche WebLink
$1,298,252.00 more than the minimum required liability to fully reclaim the remaining disturbed areas at the <br /> Colowyo Mine. <br /> Any person with a valid legal interest which might be adversely affected by this proposed decision may request a <br /> formal public hearing before the Mined Land Reclamation Board in accordance with Rule 3.03.2(6). Public notice <br /> of this proposed decision will be published twice in the Craig Daily Press as soon as possible. Requests for public <br /> hearing must be submitted to the Division in writing within thirty days of the first publication in the Craig Daily <br /> Press. If no hearing is requested within those thirty days,the Division's decision will become final. <br /> This concludes the Proposed Decision and Findings of Compliance for the Colowyo Mine Partial Phase I,II <br /> and III Bond Release SL-25. <br /> TABLES AND FIGURES <br /> Table 1. Comparison of Measured elevation points collected along Streeter South Side Ditch to elevations shown <br /> on the`SL-25 Phase III III Bond Release Area Map',data point collection locations are shown below on Map 1 <br /> and follow location points chronologically north to south. <br /> Data Point Measured Map Elevation <br /> Elevation (ft) (ft) <br /> 1 6910 6900 <br /> 2 6930 6925 <br /> 3 6950 6950 <br /> 4 6950 6950 <br /> 5 6960 6960 <br /> 6 6960 6960 <br /> 7 6970 6970 <br /> 8 6990 6990 <br /> Proposed Decision and Findings of Compliance <br /> Partial Phase I,II and III Bond Release SL-25 Page 10 of 14 <br />