My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-11-19_GENERAL DOCUMENTS - C1981019
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981019
>
2025-11-19_GENERAL DOCUMENTS - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2025 2:18:12 PM
Creation date
11/20/2025 2:17:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
General Documents
Doc Date
11/19/2025
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Colowyo Coal Company L.P.
Type & Sequence
SL25
Permit Index Doc Type
Findings
Email Name
HR1
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
$1,298,252.00 more than the minimum required liability to fully reclaim the remaining disturbed areas at the <br /> Colowyo Mine. <br /> Any person with a valid legal interest which might be adversely affected by this proposed decision may request a <br /> formal public hearing before the Mined Land Reclamation Board in accordance with Rule 3.03.2(6). Public notice <br /> of this proposed decision will be published twice in the Craig Daily Press as soon as possible. Requests for public <br /> hearing must be submitted to the Division in writing within thirty days of the first publication in the Craig Daily <br /> Press. If no hearing is requested within those thirty days,the Division's decision will become final. <br /> This concludes the Proposed Decision and Findings of Compliance for the Colowyo Mine Partial Phase I,II <br /> and III Bond Release SL-25. <br /> TABLES AND FIGURES <br /> Table 1. Comparison of Measured elevation points collected along Streeter South Side Ditch to elevations shown <br /> on the`SL-25 Phase III III Bond Release Area Map',data point collection locations are shown below on Map 1 <br /> and follow location points chronologically north to south. <br /> Data Point Measured Map Elevation <br /> Elevation (ft) (ft) <br /> 1 6910 6900 <br /> 2 6930 6925 <br /> 3 6950 6950 <br /> 4 6950 6950 <br /> 5 6960 6960 <br /> 6 6960 6960 <br /> 7 6970 6970 <br /> 8 6990 6990 <br /> Proposed Decision and Findings of Compliance <br /> Partial Phase I,II and III Bond Release SL-25 Page 10 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.