Laserfiche WebLink
Section 6 Implementation <br /> Currently the diesel fuel containment facility is the only preventative facility in place. <br /> The other preventative facilities will be constructed as production activities resume at the <br /> mine, and the materials they are designed for are brought on to the mine site. <br /> Section 7 Periodic Review <br /> The Spill Prevention and Control Plan will be reviewed and updated, as necessary,when <br /> changes to the mine facility layout and materials in use there occur. <br /> xxxv <br />