Laserfiche WebLink
JD-8 Mine-Drainage Design Plan 13 <br /> ADTable 11. Drainage Basin Areas - Planned Final Topography <br /> Area Area <br /> Zone (ft2) (acres) Type <br /> Reclaimed Waste Rock 223,707 5.14 Disturbed area <br /> 1 50,280 1.15 Non-contact area(undisturbed) <br /> 4 73,550 1.69 Non-contact area(undisturbed) <br /> 4.2 10-year 24-hour Runoff and Retention for Post-Mining Condition <br /> The calculated total runoff entering the operational and post mining retention Pond 3 from the 10-year 24- <br /> hour storm is shown in Table 12 and calculated at 12,785 ft3. <br /> Table 12. Calculated 10-year 24-hour Runoff based on Planned Final Topography <br /> Soil Type/ Curve Rainfall Runoff Runoff <br /> AREA Hydrologic Group/ Conditi AREA Number P Retention q Q <br /> Cover Description on (acres) CN (inches) S (inches) (ft3) <br /> Reclaimed Bodot/Ustic Torriorthents <br /> Waste Rock Group C Poor 5.14 85 1.80 1.76 0.65 12,165 <br /> Sagebrush with grass understory <br /> Bodot/Ustic Torriorthents <br /> 1 Group C Fair 1.15 63 1.80 5.87 0.06 251 <br /> Sagebrush with grass understory <br /> Bodot/Ustic Torriorthents <br /> 410 4 Group C Fair 1.69 63 1.80 5.87 0.06 369 <br /> Sagebrush with grass understory <br /> Total: 12,785 ft3 <br /> The preliminary location and dimensions for Retention Pond 3 are shown in Figure 3 and Table 13. The <br /> proposed volume of 13,130 ft3 (at 2.5 ft. deep) using the available 9,656 ft2 footprint shown with 5H:IV <br /> side slopes and a 3.5 ft total depth will retain runoff from the 10-year 24-hour event with a 1.0 ft freeboard. <br /> The freeboard will be reduced to 0.5 ft during the 100-year 24-hour event. <br /> Table 13. Planned Dimensions for the Operational and Post-Mining Storm Water Retention <br /> Structure (Pond 3) <br /> Area of Storm Water Pond 9,656 ft2 <br /> Area of Floor(5H:1V slopes) 3,375 ft2 <br /> Perimeter of Floor 300.6 ft <br /> Total Depth 3.5 ft <br /> Volume(2.5 ft. deep) 13,130 ft3 <br /> 0.301 acre-ft <br /> 98,210 Gallons <br /> Freeboard(10-year 24-hour) 1.0 ft <br /> Freeboard(100-year 24-hour) 0.5 ft <br /> 4.3 100-year 24-hour Routing Capacity <br /> • The storage and routing capacity of Pond 3 in the operational and post-mining conditions were evaluated <br /> using the NRCS Graphical Peak Discharge Method. Calculation parameters for the 100-year 24-hour <br /> 4122A.120702 Whetstone Associates <br />