My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-11-14_PERMIT FILE - M2025056 (32)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2025056
>
2025-11-14_PERMIT FILE - M2025056 (32)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2025 9:55:11 AM
Creation date
11/20/2025 8:40:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2025056
IBM Index Class Name
Permit File
Doc Date
11/14/2025
Doc Name Note
Rule 8 Spill Prevention and Control Plan
Doc Name
Application
From
Highbury Resources Inc
To
DRMS
Email Name
DMC
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JD-8 Mine-Drainage Design Plan 13 <br /> ADTable 11. Drainage Basin Areas - Planned Final Topography <br /> Area Area <br /> Zone (ft2) (acres) Type <br /> Reclaimed Waste Rock 223,707 5.14 Disturbed area <br /> 1 50,280 1.15 Non-contact area(undisturbed) <br /> 4 73,550 1.69 Non-contact area(undisturbed) <br /> 4.2 10-year 24-hour Runoff and Retention for Post-Mining Condition <br /> The calculated total runoff entering the operational and post mining retention Pond 3 from the 10-year 24- <br /> hour storm is shown in Table 12 and calculated at 12,785 ft3. <br /> Table 12. Calculated 10-year 24-hour Runoff based on Planned Final Topography <br /> Soil Type/ Curve Rainfall Runoff Runoff <br /> AREA Hydrologic Group/ Conditi AREA Number P Retention q Q <br /> Cover Description on (acres) CN (inches) S (inches) (ft3) <br /> Reclaimed Bodot/Ustic Torriorthents <br /> Waste Rock Group C Poor 5.14 85 1.80 1.76 0.65 12,165 <br /> Sagebrush with grass understory <br /> Bodot/Ustic Torriorthents <br /> 1 Group C Fair 1.15 63 1.80 5.87 0.06 251 <br /> Sagebrush with grass understory <br /> Bodot/Ustic Torriorthents <br /> 410 4 Group C Fair 1.69 63 1.80 5.87 0.06 369 <br /> Sagebrush with grass understory <br /> Total: 12,785 ft3 <br /> The preliminary location and dimensions for Retention Pond 3 are shown in Figure 3 and Table 13. The <br /> proposed volume of 13,130 ft3 (at 2.5 ft. deep) using the available 9,656 ft2 footprint shown with 5H:IV <br /> side slopes and a 3.5 ft total depth will retain runoff from the 10-year 24-hour event with a 1.0 ft freeboard. <br /> The freeboard will be reduced to 0.5 ft during the 100-year 24-hour event. <br /> Table 13. Planned Dimensions for the Operational and Post-Mining Storm Water Retention <br /> Structure (Pond 3) <br /> Area of Storm Water Pond 9,656 ft2 <br /> Area of Floor(5H:1V slopes) 3,375 ft2 <br /> Perimeter of Floor 300.6 ft <br /> Total Depth 3.5 ft <br /> Volume(2.5 ft. deep) 13,130 ft3 <br /> 0.301 acre-ft <br /> 98,210 Gallons <br /> Freeboard(10-year 24-hour) 1.0 ft <br /> Freeboard(100-year 24-hour) 0.5 ft <br /> 4.3 100-year 24-hour Routing Capacity <br /> • The storage and routing capacity of Pond 3 in the operational and post-mining conditions were evaluated <br /> using the NRCS Graphical Peak Discharge Method. Calculation parameters for the 100-year 24-hour <br /> 4122A.120702 Whetstone Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.