Laserfiche WebLink
• <br /> Project Area Task Cost <br /> Lower Area Remove 40'x 60'shop/dry building $ 6,120.00 <br /> Remove shop/dry building concrete $ 3,592.00 <br /> Plug portal $ 3,248.00 <br /> Recontour waste pile $ 2,214.00 <br /> Spread soil cover material $ 8,259.00 <br /> Seeding $ 2,600.00 <br /> Total Lower $ 26,033.00 <br /> Upper Area Remove headframe $ 9,180.00 <br /> Remove hoist house $ 6,120.00 <br /> Remove hoist house concrete $ 1,347.00 <br /> Remove material under ore pad $ 1,218.00 <br /> Plug shaft $ 6,868.00 <br /> Recontour waste dump $ 5,318.00 <br /> Spreading soil $ 18,233.00 <br /> • Seeding $ 2,096.00 <br /> Plug vent holes $ 13,736.00 <br /> Total Upper $ 64,116.00 <br /> Overall Total $ 90,149.00 <br /> • <br /> 3 <br />