My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-11-10_REVISION - P2009002
DRMS
>
Day Forward
>
Revision
>
Prospect
>
P2009002
>
2025-11-10_REVISION - P2009002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/24/2025 9:53:18 AM
Creation date
11/12/2025 9:01:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2009002
IBM Index Class Name
Revision
Doc Date
11/10/2025
Doc Name
Notice of Surety Increase
From
DRMS
To
Ann Lemberg Golden Age Number Two Mining Co.
Type & Sequence
SI2
Email Name
JPL
JLE
SMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> Task description: Cost Summary <br /> Site: Golden Age#2 Mining Permit Action: Insp 2025 Permit/Job#: P2009002 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 10/23/2025 County: Boulder Filename: P002-000 <br /> User: JPL <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Form Fleet Task <br /> Task Description Used Size Hours Cost <br /> 001 Backfill Trench LOADER 1 0.21 $45 <br /> 002 Reveg with Boulder Co Seed Mix REVEGE 1 8.00 $97 <br /> 003 Mob/Demob MOBILIZE 1 4.03 $1,085 <br /> SUBTOTALS: 12.24 $1,227 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $25 <br /> Performance bond: 1.05 Total= $13 <br /> Job superintendent: 6.12 Total= $460 <br /> Profit: 10.00 Total= $123 <br /> TOTAL O&P= $620 <br /> CONTRACT AMOUNT(direct+O&P)= $1,847 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): $0 Total= $0 <br /> Engineering work and/or contract/bid preparation: 4.25 Total= $79 <br /> Reclamation management and/or administration: 5.00 $92 <br /> CONTINGENCY: 0.00 Total= $0 <br /> TOTAL INDIRECT COST= $791 <br /> TOTAL BOND AMOUNT(direct+indirect)= $2,018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.