My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-10-31_PERMIT FILE - C1981019 (5)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2025-10-31_PERMIT FILE - C1981019 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2025 10:39:26 AM
Creation date
11/10/2025 10:34:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Permit File
Doc Date
10/31/2025
Section_Exhibit Name
2.05 Operations and Reclamation Plans
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RULE 2 PERMITS <br /> <br />Rule 2 Permits 2.05-12 Revision Date: 8/6/25 <br /> Revision No.: PR-05 <br /> <br />The planned coal production at the Colowyo operation is shown in Table 2.05-2. <br /> <br />Blasting <br /> <br />Colowyo usually engages in blasting of overburden and coal before its removal. A general <br />sequence for drilling and blasting of overburden and coal will proceed as follows: <br />(1) Establish a drill bench on the overburden. <br />(2) Utilize the timing model to determine the maximum number of blast holes that will ignite <br />in any 8-millisecond period, this will determine the size of the blast pattern and the <br />maximum amount of explosive to ignite at any 8 ms time period. <br />(3) Compare this poundage of explosives to the “scale distance formula” result. If the blast <br />design exceeds the criterion of the “scale distance formula,” then we will revise the <br />design until compliance is met. <br />(4) Blast pattern design will then be sent to the field for implementation by the blasters. <br />(5) Drill blasting pattern. <br />(6) Load drill holes with explosives. <br />(7) Blast reports will then be recorded to meet the criteria noted in Rule 4.08.5 (1) thru (18) <br />for surface coal mining operations. <br />(8) Blast overburden. <br />(9) Remove blasted overburden with shovel, front-end loader, or dragline. <br />(10) Clean coal seam. <br />(11) Drill blasting pattern. <br />(12) Load drill holes with explosives. <br />(13) Blast Coal Seam <br />(14) Remove blasted coal with front-end loaders. <br /> <br />Colowyo will comply with all applicable state and federal laws in its use of explosives. <br />Experienced, trained, certified and competent persons conduct all blasting operations. <br /> <br />Because of the inherent complexities of the Colowyo mining operation, the surface blasting <br />program has been developed to conform with a variety of coal seams and the diverse overburden <br />handling techniques. The coal blasting will vary from coal seam to coal seam because of the <br />different thickness encountered. Three general types of overburden blasting will be required: one <br />for blasting overburden, one for the pre-splitting of overburden to provide for safer highwalls and <br />one for blasting coal. <br /> <br />Approximate blasting patterns for coal and overburden are shown in Table 2.05-4, Blasting <br />Parameters – Overburden (Typical); Table 2.05-5 Blasting parameters – Overburden pre-Split Shot <br />(Typical) and Table 2.05-6, Blasting Parameters – Coal (Typical). <br /> <br />Colowyo will conduct a timing analysis through various methods for each overburden shot <br />utilizing the down hole delay timing, hole-to-hole delay timing, and row to row timing as <br />applicable to verify the maximum number of holes and thereby pounds of explosive detonated per <br />8 ms time period. This analysis can be conducted by hand or with computer software that predicts
The URL can be used to link to this page
Your browser does not support the video tag.