My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-10-31_GENERAL DOCUMENTS - C1981019
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981019
>
2025-10-31_GENERAL DOCUMENTS - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2025 10:50:43 AM
Creation date
11/4/2025 10:49:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
General Documents
Doc Date
10/31/2025
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Colowyo Coal Company
Type & Sequence
PR5
Permit Index Doc Type
Findings
Email Name
HR1
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.1.5 Status of Bond Releases <br /> Colowyo has applied and been approved for twenty-four previous bond releases: <br /> Previous Bond Release Summary <br /> Bond Release Phase Submittal Approval Date <br /> Date <br /> SL-01 I and II 7/2/1987 10/8/1987 <br /> SL-02 I 9/25/1997 4/27/1998 <br /> SL-03 II 9/26/2000 8/15/2001 <br /> SL-04 I and II 6/1/2001 7/25/2001 <br /> SL-05 III 6/28/2010 7/25/2012 <br /> SL-06 I 4/26/2012 4/9/2013 <br /> SL-07 I 4/2/2013 8/29/2013 <br /> SL-08 I 5/20/2015 1/7/2016 <br /> SL-09 I 2/29/2016 9/28/2016 <br /> SL-10 III 7/18/2016 1/12/2017 <br /> SL-11 I 3/10/2017 11/13/2017 <br /> SL-12 II and III 3/10/2017 12/7/2017 <br /> SL-13 I 4/12/2018 8/30/18 <br /> SL-14 II and III 5/24/18 11/24/18 <br /> SL-15 I, II, and III 2/8/19 9/10/19 <br /> SL-16 I, II, and III 6/26/19 11/26/19 <br /> SL-17 I, II, and III 9/26/19 1/25/20 <br /> SL-18 I 3/20/20 8/22/20 <br /> SL-19 II 7/22/20 10/26/20 <br /> SL-20 1 4/13/21 5/28/21 <br /> SL-21 I 2/28/22 6/24/22 <br /> SL-22 II 7/13/2023 11/3/2023 <br /> SL-23 I, II, and III 9/16/2024 1/22/2025 <br /> SL-24 I 3/20/2025 8/6/2025 <br /> 3.1.6 Status of Technical Revisions and Minor Revisions <br /> Since the approval of Permit Renewal No. 8 (April 18, 2022),the following minor revisions (MR) <br /> and technical revisions (TR)have been received for Permit No. C-1981- 019. <br /> Minor Revision 240—MR240 updates Exhibit 13C with additional areas scheduled for topsoil <br /> removal to support the advancement of surface and highwall mining in the Collom Pit. The <br /> 8 <br /> Permit Revision No.5(PR-05),G 1981-019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.