My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-10-31_GENERAL DOCUMENTS - C1981019
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981019
>
2025-10-31_GENERAL DOCUMENTS - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2025 10:50:43 AM
Creation date
11/4/2025 10:49:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
General Documents
Doc Date
10/31/2025
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Colowyo Coal Company
Type & Sequence
PR5
Permit Index Doc Type
Findings
Email Name
HR1
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Mine has no coal processing waste banks. <br /> IX. Coal Mine Waste -Rule 4.11 <br /> No water is used in the coal processing operation, except for dust suppression, and no coal processing <br /> waste is produced. <br /> Non-coal waste is placed in the backfill of pits in a manner consistent with the requirements of Rule <br /> 4.11.4. <br /> X. Slides and Damage-Rule 4.12 <br /> The Permit is found to be in compliance with Rule 4.12. Because of the mining technique used, <br /> natural barriers are not necessary. Slides have occurred within the permit boundary; however, none <br /> have had an adverse effect on public property, health, safety, or the environment. Slides have been <br /> reclaimed as appropriate. <br /> XI. Contemporaneous Reclamation -Rule 4.13 <br /> The Permit is in compliance with Rule 4.13. Reclamation occurs as contemporaneously as <br /> practicable with mining operations, as further discussed in Section XII below. <br /> XII. Backfilling and Grading-Rule 4.14 <br /> The Permit is in compliance with Rule 4.14. <br /> A. Operations and Reclamation Plans <br /> Colowyo's operations plan is found in Section 2.05.3 of the PAP (Volume 1 for the East Pit, West <br /> Pit, Section 16 Pit,Facilities Area and Gossard Loadout;Volume 12 for South Taylor Pit;Volume 15 <br /> for Collom Pit). Maps 23, 23A, and 23B of the PAP contain the mine plan. Section <br /> 2.05.4 of the PAP contains the reclamation plan, and Section 4.14 contains the performance <br /> standards for backfilling and grading. <br /> During the approval process of Permit Revision No. 2, the Division added Stipulation 2 regarding <br /> the Lower Wilson mining area to the operations and reclamation plan at the Mine. <br /> B. Contemporaneous Reclamation <br /> Section 4.13 of the PAP contains information on contemporaneous reclamation for Colowyo's multi- <br /> seam operations, with additional information found in Sections 2.05.4 and 4.14. Backfilling and <br /> grading cannot begin with multi-seam operations until the lowest seams are mined. Therefore, <br /> backfilling and grading cannot be completed within 180 days of the removal <br /> 44 <br /> Permit Revision No.5(PR-05),G 1981-019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.