My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-09-02_REVISION - M2023015 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2023015
>
2025-09-02_REVISION - M2023015 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2025 1:38:51 PM
Creation date
10/22/2025 1:34:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2023015
IBM Index Class Name
Revision
Doc Date
9/2/2025
Doc Name Note
Application Exhibits
Doc Name
Request For Conversion
From
Lewicki & Associates
To
DRMS
Type & Sequence
CN1
Email Name
ERR
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />London Mountain Clean Up <br />July 2025 G1-2 <br /> <br /> <br />Runoff calculations contained in this appendix are based on a set of standardized basin sizes and <br />conditions. All waste pile basins will be assigned to a standard basin size during mining, and the <br />appropriate basin size will dictate the size of diversion structure conducted. <br />Calculations of runoff, both in terms of volume and flow, are according to the Rational Method. Runoff <br />conditions are calculated in the mining condition only, as no stormwater control structures will remain in <br />reclamation. <br />The Rational Method is a widely used technique in hydrology for estimating peak discharge from small <br />drainage basins during storm events. It is based on the premise that peak discharge is proportional to <br />rainfall intensity, catchment area, and a runoff coefficient that accounts for land use and soil type. The <br />method uses the formula Q = CiA, where Q is the peak discharge (cubic feet per second or cubic <br />meters per second), C is the runoff coefficient, i is the rainfall intensity (inches per hour or millimeters <br />per hour), and A is the catchment area (acres or hectares). This method is particularly useful for <br />catchments where the time of concentration is relatively short. <br />Runoff coefficients are based on land conditions (C). NOAA data for rainfall intensity (i) is used. Runoff <br />coefficients are typical values from ASCE2 tables included in the hydrology software. The coefficients <br />are based on either unimproved ground (0.20-0.25) or light industrial ground (0.5-0.6) for disturbed <br />areas of the site. <br />Assumptions: The following assumptions are made for the Lockhart surface hydrology model. <br />1. NOAA rainfall intensities that are publicly available are accurate. <br />2. The computed maximum rate of runoff to the design point is a function of the average rainfall <br />rate during the time of concentration to that point. <br />3. The hydrologic losses in the catchment are homogeneous and uniform. <br />4. The runoff coefficients represent the average soil antecedent moisture condition, <br />imperviousness, and type of soil. <br />5. The depth of rainfall used is one that occurs from the start of the storm to at least the time of <br />concentration, and the design rainfall depth during that time period is converted to the average <br />rainfall intensity for that period. <br />6. The maximum runoff rate occurs when the entire area is contributing flow. <br />Hydrographs and storm outputs (runoff, runoff peak flow, etc.) are included in the Appendix. <br />Designs for surface water control structures such as diversion ditches and sediment ponds are <br />attached to this Appendix after the hydrographs. <br /> <br /> <br />2 American Society of Civil Engineers
The URL can be used to link to this page
Your browser does not support the video tag.