Laserfiche WebLink
<br /> <br />London Mountain Clean Up <br />July 2025 G-3 <br /> <br /> <br />excavation equipment. The stormwater control structure along the edge of the active working surface <br />will thus contain any stormwater runoff from the active area until it evaporates. See Map C-2 and C-2A <br />for details of these structures. <br />3. Water Consumption <br />Water consumption at the operation will be for the purpose of dust control only. Given the handling of <br />Potentially Acid-forming Material as part of waste pile excavation, water will not be sprayed on the <br />waste piles during their excavation. Water will be sprayed on roads surfaces to control dust from haul <br />trucks. All water used at the operation will be supplied by the water rights associated with the London <br />Mountain Cleanup. <br /> <br /> <br /> <br /> <br /> <br /> <br />