My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-10-20_REVISION - M1980244 (16)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2025-10-20_REVISION - M1980244 (16)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2025 10:22:24 PM
Creation date
10/21/2025 10:14:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
10/20/2025
Doc Name Note
6. APPENDIX I
Doc Name
Request for Technical Revision
From
CC&V
To
DRMS
Type & Sequence
TR153
Email Name
ERR
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cripple Creek & Victor Gold Mining CompanyValley Leach Facility 2 Phase 3Stage B.1 Record of ConstructionGeomembrane Fusion Trial Seam SummaryStrength (ppi)Mode1Strength (ppi)Mode1Strength (ppi)Mode1Machine SettingsTest ResultsQA MonitorRemarks2,3,4Temp.(°F)Speed (ft/min)Inside Peel(Min. = 100 ppi)Outside Peel(Min. = 100 ppi)Shear(Minimum = 120 ppi)Pass/FailDateSample NumberTimeMachine NumberOperatorAmbient Air Temp.(°F)140 SE1 165 SE1159 SE1 170 SE1126 SE1 128 SE1131 SE1 132 SE1152 SE1 170 SE1154 SE1 163 SE1148 SE1 143 SE1128 SE1 150 SE1134 SE1 147 SE1125 SE1 134 SE1154 SE1 150 SE1156 SE1 155 SE1160 SE1 162 SE1146 SE1 149 SE1140 SE1 132 SE1117 SE1 123 SE1112 SE1 129 SE1103 SE1 124 SE1144 SE1 143 SE1141 SE1 142 SE1140 SE1 146 SE1143 SE1 148 SE1164 SE1 170 SE1158 SE1 172 SE1158 SE1 156 SE1143 SE1 156 SE1166 SE1 171 SE1153 SE1 160 SE1137 SE1 146 SE1145 SE1 146 SE1144 SE1 153 SE1137 SE1 147 SE1830 13.5 179 BRK P RR SS6/21/2025 TF-17 7:06 AM 1018 JS 58 830 14.0 183 BRK P RR SS6/20/2025 TF-15 7:27 AM 1018 JS 58BRK P MM SS6/21/2025 TF-19 7:30 AM 615 EL 60SS6/20/2025 TF-16 10:15 AM 556 EL 69 830 14.0 158830 14.0 159 BRK P MM6/21/2025 TF-18 7:20 AM 615 EL 60BRK P KRG SS6/24/2025 TF-21 7:20 AM 615 EL 51SS6/24/2025 TF-20 7:00 AM 1018 JS 51 830 14.0 192840 14.0 168 BRK P RRBRK P KRG TT6/25/2025 TF-23 2:54 PM 1018 JS 64SS6/24/2025 TF-22 8:00 AM 615 EL 53 840 14.0 142840 13.5 187 BRK P KRGBRK P KRG TT6/26/2025 TF-25 8:14 AM 1018 JS 55SS6/25/2025 TF-24 2:57 PM 1018 JS 64 830 14.0 166830 14.0 134 BRK P KRGBRK P MM TT6/27/2025 TF-27 7:17 AM 1018 JS 54SS6/26/2025 TF-26 9:24 AM 615 DG 58 830 14.0 199830 14.0 174 BRK P MMBRK P MM TT6/28/2025 TF-29 7:10 AM 1018 JS 56SS6/27/2025 TF-28 7:22 AM 1018 JS 54 830 14.0 145830 14.0 194 BRK P MM- F MM SSSS6/28/2025 TF-30 7:16 AM 615 DG 56 830 14.0 -830 14.0 181 BRK P MMPage 2 of 8 1See Figure 3 for Break Modes2TT - Textured to Textured Weld3SS - Smooth to Smooth Weld4 ST-Smooth to Textured Weld
The URL can be used to link to this page
Your browser does not support the video tag.