Laserfiche WebLink
Client: Lab Sample No.: <br />Project: <br />Project No.: Location: <br />Phase: Elevation/Depth: <br />Requested By: Tested By: <br />Test Started: Checked By: <br />Test Finished: Sample Description: <br />Type of Permeant <br />Magnitude of Back pressure (psi) <br />Saturated (Y/N): <br />Stage 1: Effective Stress (psi) <br />Sample Type <br />Burrete Area (cm2) <br />Test Specimen Data <br />Wet Soil + Tare (g) <br />Dry Soil + Tare (g) <br />Tare (g) <br />Wt. of Water (g) <br />Dry Soil (g) <br />Moisture Content (%) <br />Sample Volume (ft3) <br />Dry Density (pcf) <br />Wet Density (pcf) <br />Saturation (%) <br />Percent Compaction <br />Height (in) <br />Diameter (in) <br />Area (in2) <br />Est. Moisture Content after Consolidation (%) <br />Est. Void Ratio after Consolidation <br />Specific Gravity* <br />*Specific gravity is assumed <br />Maximum Dry Density: <br />ASTM D 698 <br />1.0 1.3 <br />0.00 <br />62.15 <br />6.7E-07 <br />5.0 <br />3.018 <br />2.773 <br />6.041 <br />3.019 <br />6.046 <br />10.6 <br />122.3 <br />128.1 <br />10.6 <br />95% <br />0.352 <br />0.354 <br />0.877 <br />Brown clayey sand <br />with gravel <br />Initial <br />647.39 <br />585.24 <br />De-aired Bottled <br />45 <br />Yes <br />5 <br />Remolded <br />Cripple Creek and Victor Gold Mines <br />VLF2 PH3 Stage B <br />79.9 <br />Final <br />902.10 <br />824.10 <br />239.00 <br />78.00 <br />585.10 <br />13.3 <br />0.01055 <br />122.2 <br />138.5 <br />100.0 <br />585.24 <br />10.6 <br />Gradient Range (h/L): <br />Test Boundary Conditions <br />Maximum Dry Density (pcf): <br />Initial Remolded Dry Density (pcf): <br />Initial Percent Compaction: <br />Initial Void Ratio: <br />Optimum Moisture Content(%): <br />2.775 <br />95.5 95.4 <br />2.65 <br />During k Testing <br />0.01055 <br />122.3 <br />135.3 <br />13.4% <br />Flexible Wall Hydraulic Conductivity <br />ASTM D5084 <br />Initial Water Content (%): <br />Confining Pressure (psi): <br />Hydraulic Conductivity, k20 (cm/s): <br />TW <br />SLF-50-C <br />Upper Dump 1 SLF Stockpile <br />FG <br />TW/SC <br />B <br />TW <br />10/4/2023 <br />10/17/2023 <br />475.0106.060