Laserfiche WebLink
Newmont‐Cripple Creek & Victor Gold Mine  <br />Technical Specification No. 01400 EARTHWORK CQA  <br />VLF2 Phase 3  <br />Project No.475.0106.049  <br />August 27, 2021  <br />  <br />  <br />  <br />Technical Specification No. 01400 Earthwork CQA    Page 3  <br />responsibility of overseeing the CQA aspects of the Work. In this CQA Plan the CQA MONITOR is  <br />associated with the CERTIFYING ENGINEER, and refers specifically to (To Be Determined). The  <br />CQA MONITOR has the authority to stop any aspect of the Work that is not in compliance with  <br />the CQA Plan. Work would then be resumed once corrective action has been approved by  <br />MANAGER. The specific responsibilities of the CQA MONITOR include:  <br /> review the DRAWINGS, SPECIFICATIONS, and related guidance documents;  <br /> review all CONTRACTOR QC submittals and make appropriate recommendations;  <br /> obtain preconstruction and construction samples and perform material evaluation testing as  <br />required;  <br /> monitor foundation preparation activities as discussed in Section 6.3.1 and material  <br />placement as discussed in Section 6.3.2;  <br /> assure that testing equipment used and tests performed are conducted according to  <br />SPECIFICATIONS and industry standards;  <br /> document and report test results to MANAGER;  <br /> report any deficiencies to MANAGER that are not corrected to the satisfaction of the CQA  <br />MONITOR, including design or SPECIFICATION changes;  <br /> prepare a Construction Certification Report describing the construction, any deviations from  <br />SPECIFICATIONS or DRAWINGS and details, details of all field and laboratory test data, tests  <br />results (both laboratory and field), professional certification that construction was completed  <br />in accordance with the DRAWINGS and SPECIFICATIONS. The Construction Certification  <br />Report will be signed and sealed by the CERTIFYING ENGINEER registered in the State of  <br />Colorado;  <br /> monitor the ambient air temperature and fill temperature, as outlined in Section 2200 of the  <br />SPECIFICATIONS; and  <br /> maintain an on‐site soils laboratory and perform regular calibration of equipment.  <br />2.6. Earthworks Contractor  <br />The Earthworks Contractor, also referred to as "CONTRACTOR", is responsible for proper  <br />processing, delivery and placement of all components as outlined in the SPECIFICATIONS.  <br />3. PART 3: LINES OF COMMUNICATION  <br />The CQA MONITOR shall be capable of direct communication with MANAGER, DESIGN  <br />ENGINEER and CERTIFYING ENGINEER at all times. Deficiencies that can be easily remedied, such  <br />as unsatisfactory test results, will be dealt with directly between the CQA MONITOR, and  <br />CONTRACTOR. The CQA MONITOR will also discuss any deficiencies with the CERTIFYING  <br />ENGINEER.