Laserfiche WebLink
Table 4Cripple Creek & Victor Gold Mining CompanyValley Leach Facility 2Phase 3 Stage B.1 Record of ConstructionCQA Earthworks Testing Summary - Structural Fill24.0" 18.0" 8.0" 4.0" 3.0" 2.0" 1.5" 1.0" 0.75" 0.5" 0.375" #4 #10 #16 #40 #50 #100 #200PLASTIC LIMITLIQUID LIMITPLASTIC INDEXPHASE NORTHING EASTING100 - 40-100--------------0-25- - 30 MAX.SF-1-R 06/05/25 B.1 59,047.037,4592' BFG - 100 89.6 83 65.1 48.3 37.4 30 24.7 19.5 14.3 11.4 6.5 5.1 4.7 3 2.9 2.8 2.6 GW-GM NP NV NP1. Samples with a Plasticty Index of less than 5 are reported as Non Plastic. Notes:SAMPLE NUMBERDATE SAMPLEDSPECIFICATIONLOCATIONATTERBERG LIMITSSPECIFICATION - PERCENT PASSINGUSCS GRAIN SIZE DISTRIBUTION - PERCENT PASSINGELEVATION (FT)NATURAL MOISTURE (%)2. BFG = Below Finish GradeR - Record Sample; BFG - Below Finished GradeNP - Non Plastic; NV - No ValuePage 1 of 1