My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-10-20_REVISION - M1980244 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2025-10-20_REVISION - M1980244 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2025 10:22:09 PM
Creation date
10/21/2025 10:01:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
10/20/2025
Doc Name Note
2. ISSUED FOR CONSTRUCTION DRAWINGS
Doc Name
Request for Technical Revision
From
CC&V
To
DRMS
Type & Sequence
TR153
Email Name
ERR
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a - <br />_ RRAD <br />HE <br />woo I <br />J �/ <br />rah ���:,c-�_�► <br />,�-a► <br />/�.�►���� <br />r� <br />,: <br />III <br />I I-11I /�■p— �� <br />� � <br />� <br />� <br />0 200 400 FEET <br />Reference: <br />NEWMONT PROVIDED THE 2020 FLYOVER DATA TO NEWFIELDS ON JAN. 13, 2021 IN THE <br />FOLLOWING FILE: "5ft topo 9-1-20.DWG". EXISTING GROUND INCLUDES FUTURE SCHIST <br />ISLAND PIT CONFIGURATIONS. <br />LEGEND: <br />EXISTING GROUND CONTOURS <br />EXISTING PHASE 3 STAGE A <br />GEOMEMBRANE LINER CONTOURS <br />III-III=III-III LIMITS OF SUBGRADE CONSTRUCTION <br />ONLY (SEE NOTE 4) <br />CUT ISOPACH CONTOURS <br />FILL ISOPACH CONTOURS <br />EXISTING ROADS/TRAILS <br />NOTE: <br />1. FOR INFORMATION ONLY. <br />2. ISOPACH CONTOURS REPRESENTS THE CUT/FILL <br />DEPTH FOR EXISTING GROUND VS PROPOSED <br />GROUND. <br />3. PROPOSED CONTOURS REPRESENTS TOP OF <br />SOIL LINER FILL WITHIN THE GEOMEMBRANE <br />LIMITS AND FINISHED GRADE EVERYWHERE ELSE. <br />4. SLF, GEOMEMBRANE, PIPING AND DCF WILL BE <br />CONSTRUCTED WITH PHASE 3 STAGE C. <br />5. THE GEOMEMBRANE LIMITS ARE SHOWN ON DWG <br />A160. <br />VOLUME <br />CUT (CY) FILL (CY) <br />5,631,000 91,000 <br />>! 3757f) <br />SJONAL�* <br />FORESIGHT WEST PROVIDED THE AS —BUILT PHASE 2 TOP OF SLF SURFACE TO <br />NEWFIELDS ON SEPT. 24, 2020 IN A FILE CALLED "Clay As —built thru 9-24-20.DWG" <br />
The URL can be used to link to this page
Your browser does not support the video tag.