Laserfiche WebLink
R <br />Ld <br />Z <br />O <br />J <br />W <br />I p4g, <br />ELM <br />PA <br />TIE INT LA. <br />0 60 120 FEET <br />10300 <br />10300 <br />K:25.06 <br />K:50.2 <br />LVC:95.5 <br />LVC:80. <br />5 <br />PVI <br />S :1 <br />10275 <br />PVI <br />ELEV: 1 0219.3p <br />P <br />1 ELEV:10 <br />215. 9 <br />1027' <br />OM <br />�N <br />M <br />M <br />OD <br />cO <br />00 <br />M0 <br />10250 <br />+ <br />N <br />+ <br />N <br />rn <br />1025C <br />rz <br />0 <br />EXISTING <br />GROUND <br />L. <br />N <br />04 <br />W <br />V <br />10225 <br />DAD <br />GROU <br />D <br />j <br />v <br />1022: <br />0.0% <br />B <br />EAK STA <br />= + <br />10200 <br />ELEV <br />1021 <br />.29 <br />1020C <br />EXISTING <br />GROIIND <br />EL <br />ATION <br />PROPOSED <br />ELEV <br />TION <br />10175 <br />1017' <br />o� <br />o^ <br />o <br />0000°'o°'o <br />N <br />N <br />N <br />N m <br />^OfN <br />N <br />N <br />u2ri <br />u2 <br />W <br />a0 <br />u2^ <br />111 <br />N6 <br />Nu) <br />u2 <br />uj u2 <br />uj u2 <br />uj u2 <br />uj u2 <br />uj u2 <br />uj u2 <br />uj u2n <br />�uj <br />u2 <br />uj u20 <br />�uj <br />u2 <br />uj Muj <br />N <br />N NN <br />N N <br />N N <br />N N <br />N N <br />N N <br />N N <br />N N <br />N N <br />N N <br />N N <br />N N <br />N N <br />N N <br />N N <br />N N <br />N NO <br />p O <br />p O <br />p O <br />O <br />p O <br />p O <br />p O <br />p O <br />p O <br />p O <br />p O <br />p O <br />p O <br />p O <br />p O <br />p O <br />p O <br />p O <br />p O <br />p O <br />p <br />18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00 27+89 <br />STATION, (FEET) <br />0 60 120 FEET 0 30 60 FEET <br />HORIZONTAL VERTICAL <br />2X EXAGGERATION <br />I Reference: <br />j NEWMONT PROVIDED THE 2020 FLYOVER DATA TO NEWFIELDS ON JAN. 13, 2021 IN THE <br />FOLLOWING FILE: "5ft topo 9-1-20.DWG". EXISTING GROUND INCLUDES FUTURE SCHIST <br />ISLAND PIT CONFIGURATIONS. <br />R <br />LEGEND: <br />EXISTING GROUND CONTOURS <br />PROPOSED PHASE 3 STAGE C GROUND <br />CONTOURS <br />PROPOSED PHASE 3 STAGE B GROUND <br />CONTOURS <br />EXISTING ROADS/TRAILS <br />NOTE: <br />1. PROPOSED CONTOURS REPRESENT TOP OF <br />SOIL LINER FILL WITHIN THE GEOMEMBRANE <br />LIMITS AND FINISHED GRADE EVERYWHERE <br />ELSE. <br />2. THE GEOMEMBRANE LIMITS ARE SHOWN ON <br />SHEET A160. <br />3. SEE DESIGN DRAWING A370 FOR PHASE 3 <br />STAGE C PERIMETER ACCESS ROAD ALIGNMENT <br />DATA. <br />_j: >! A7574J <br />�SJ�NAL�� <br />I FORESIGHT WEST PROVIDED THE AS —BUILT PHASE 2 TOP OF SLF SURFACE TO <br />NEWFIELDS ON SEPT. 24, 2020 IN A FILE CALLED "Clay As —built thru 9-24-20.DWG" <br />0 <br />L <br />