|
SEE SHEET A340 FOR STAGE C LEAK DETECTION TRENCH 1 PLAN & PROFILE.
<br />SEE SHEET A340 FOR STAGE C LEAK DETECTION TRENCH 2 PLAN & PROFILE.
<br />a
<br />N
<br />ry
<br />a
<br />SEE SHEET A341 FOR STAGE C
<br />LEAK DETECTION TRENCH 3 PLAN & PROFILE.
<br />N
<br />O
<br />N
<br />N
<br />3
<br />N
<br />m
<br />a
<br />0
<br />0
<br />O
<br />O �C,�T
<br />0
<br />Q
<br />a
<br />3757
<br />•�
<br />C�
<br />s
<br />a
<br />N
<br />i
<br />SSJ�NAL�
<br />N
<br />APPROVED W.
<br />DISCLAIMER
<br />��� CLIENT CRIPPLE CREEK & VICTOR
<br />a
<br />JNM NEWFIELDS PRODUCED
<br />THE INFORMATION PRESENTED .
<br />ewFields
<br />GOLD MINING COMPANY
<br />o
<br />CHECKED BY: ON THIS DRAWING THROUGH THE
<br />USE OF AVAILABLE PROJECT
<br />o
<br />JNM AND
<br />IGUARANTEE
<br />VLF2 PHASE
<br />3 STAGE B & C
<br />RECEMNGTECHNICALTHSODRAWNG
<br />DOES NOTRMATION
<br />ANY
<br />N
<br />DESIGNED BY: RIGHTS EITHER SUCH TECHNICAL INFORMATION OR
<br />I z/27/24
<br />RE -ISSUED FOR CONSTRUCTION
<br />zB JNM
<br />NC
<br />JEP EXPERIENCE.
<br />ANY MODIFICATION
<br />OR ADAPTATION OF TITLE
<br />FILENAME
<br />°
<br />o R/z7/zi
<br />ISSUED FOR CONSTRUCTION
<br />cnz JNM
<br />THE DATA OR DRAWING SHALL BE AT USERS
<br />RISK
<br />STAGE C LEAK DETECTION 0106.049.128P
<br />a
<br />DRAWN BY: AND WITHOUT ANY LIABILITY OR
<br />LEGAL
<br />ALIGNMENT TABLES DRAWING N0. REVISION
<br />REV DATE
<br />DESCRIPTION
<br />TECH ENG
<br />JEP RESPONSIBILITY TO NEWFIELDS.
<br />A342 1
<br />STAGE C LEAK DETECTION TRENCH 1 ALIGNMENT TABLE
<br />STATION
<br />NORTHING
<br />EASTING
<br />DELTA (D-M-S)
<br />LENGTH (FT)
<br />RADIUS (FT)
<br />EP
<br />0+00.00
<br />59,899.38
<br />37,491.61
<br />PC
<br />0+64.15
<br />59,836.33
<br />37,503.40
<br />040-46-24
<br />7.12
<br />10.00
<br />EP
<br />0+71.26
<br />59,830.35
<br />37,506.98
<br />PC
<br />1+03.42
<br />59,810.27
<br />37,532.10
<br />080-49-36
<br />14.11
<br />10.00
<br />EP
<br />1+17.53
<br />59,797.54
<br />37,534.56
<br />PC
<br />1+17.83
<br />59,797.28
<br />37,534.41
<br />002-40-45
<br />0.47
<br />10.00
<br />EP
<br />1+18.30
<br />59,796.88
<br />37,534.17
<br />PC
<br />1+27.92
<br />59,788.73
<br />37,529.05
<br />001-36-14
<br />0.28
<br />10.00
<br />EP
<br />1+28.20
<br />59,788.49
<br />37,528.91
<br />PC
<br />1+46.66
<br />59,772.59
<br />37,519.53
<br />012-55-31
<br />2.26
<br />10.00
<br />EP
<br />1+48.92
<br />59,770.54
<br />37,518.61
<br />PC
<br />2+44.24
<br />59,679.68
<br />37,489.76
<br />002-55-31
<br />3.82
<br />74.80
<br />EP
<br />2+48.06
<br />59,676.01
<br />37,488.69
<br />PC
<br />3+12.25
<br />59,613.93
<br />37,472.42
<br />017-13-23
<br />105.28
<br />350.23
<br />EP
<br />4+17.53
<br />59,509.64
<br />37,461.31
<br />PC
<br />4+47.90
<br />59,479.29
<br />37,462.65
<br />035-12-55
<br />304.07
<br />494.73
<br />EP
<br />7+51.98
<br />59,198.28
<br />37,565.70
<br />PC
<br />8+08.04
<br />59,153.95
<br />37,600.02
<br />001-53-08
<br />44.73
<br />1359.30
<br />EP
<br />8+52.77
<br />59,119.04
<br />37,627.98
<br />PC
<br />8+72.31
<br />59,103.99
<br />37,640.44
<br />020-38-07
<br />11.53
<br />32.03
<br />EP
<br />8+83.84
<br />59,093.98
<br />37,646.06
<br />STAGE C LEAK DETECTION TRENCH 2 ALIGNMENT TABLE
<br />STATION
<br />NORTHING
<br />EASTING
<br />DELTA (D-M-S)
<br />LENGTH (FT)
<br />RADIUS (FT)
<br />EP
<br />0+00.00
<br />59,901.22
<br />37,501.44
<br />PC
<br />0+60.43
<br />59,841.82
<br />37,512.55
<br />040-46-24
<br />7.12
<br />10.00
<br />EP
<br />0+67.55
<br />59,835.84
<br />37,516.13
<br />PC
<br />1+08.98
<br />59,809.97
<br />37,548.50
<br />006-16-00
<br />1.09
<br />10.00
<br />EP
<br />1+10.08
<br />59,809.34
<br />37,549.39
<br />PC
<br />2+18.29
<br />59,751.40
<br />37,640.78
<br />004-30-58
<br />0.79
<br />10.00
<br />EP
<br />2+19.07
<br />59,750.95
<br />37,641.43
<br />PC
<br />2+80.96
<br />59,713.80
<br />37,690.92
<br />000-12-35
<br />0.04
<br />10.00
<br />EP
<br />2+80.99
<br />59,713.78
<br />37,690.95
<br />PC
<br />3+43.60
<br />59,676.02
<br />37,740.88
<br />003-16-59
<br />0.57
<br />10.00
<br />EP
<br />3+44.17
<br />59,675.66
<br />37,741.33
<br />PC
<br />3+72.34
<br />59,657.41
<br />37,762.79
<br />085-27-11
<br />14.91
<br />10.00
<br />EP
<br />3+87.26
<br />59,643.93
<br />37,764.42
<br />PC
<br />3+96.48
<br />59,636.46
<br />37,759.02
<br />018-13-18
<br />3.18
<br />10.00
<br />EP
<br />3+99.66
<br />59,633.63
<br />37,757.59
<br />PC
<br />4+45.03
<br />59,590.38
<br />37,743.86
<br />002-55-19
<br />14.59
<br />286.00
<br />EP
<br />4+59.62
<br />59,576.38
<br />37,739.81
<br />PC
<br />5+09.64
<br />59,527.99
<br />37,727.12
<br />017-07-14
<br />28.03
<br />93.81
<br />EP
<br />5+37.67
<br />59,500.23
<br />37,724.14
<br />PC
<br />5+64.53
<br />59,473.39
<br />37,725.28
<br />057-57-01
<br />240.71
<br />237.99
<br />EP
<br />8+05.24
<br />59,276.59
<br />37,845.42
<br />PC
<br />8+54.36
<br />59,252.31
<br />37,888.12
<br />058-02-24
<br />51.14
<br />50.49
<br />EP
<br />9+05.50
<br />59,210.48
<br />37,913.62
<br />STAGE C LEAK DETECTION TRENCH 3 ALIGNMENT TABLE
<br />STATION
<br />NORTHING
<br />EASTING
<br />DELTA (D-M-S)
<br />LENGTH (FT)
<br />RADIUS (FT)
<br />EP
<br />0+00.00
<br />60,460.87
<br />36,554.95
<br />PC
<br />0+66.55
<br />60,400.14
<br />36,582.16
<br />001-22-18
<br />0.24
<br />10.00
<br />EP
<br />0+66.79
<br />60,399.92
<br />36,582.26
<br />PC
<br />1+36.67
<br />60,336.85
<br />36,612.35
<br />009-36-59
<br />28.53
<br />169.98
<br />EP
<br />1+65.20
<br />60,312.25
<br />36,626.73
<br />PC
<br />1+96.69
<br />60,286.50
<br />36,644.85
<br />029-17-49
<br />190.05
<br />371.67
<br />EP
<br />3+86.73
<br />60,165.09
<br />36,788.36
<br />PC
<br />4+61.62
<br />60,132.75
<br />36,855.91
<br />005-36-11
<br />7.49
<br />76.63
<br />EP
<br />4+69.11
<br />60,129.19
<br />36,862.50
<br />PC
<br />6+53.49
<br />60,033.72
<br />37,020.24
<br />031-43-01
<br />19.68
<br />35.55
<br />EP
<br />6+73.17
<br />60,019.50
<br />37,033.47
<br />PC
<br />7+87.26
<br />59,917.93
<br />37,085.44
<br />062-15-17
<br />10.87
<br />10.00
<br />EP
<br />7+98.13
<br />59,912.49
<br />37,094.23
<br />PC
<br />8+16.05
<br />59,912.29
<br />37,112.16
<br />062-15-17
<br />10.87
<br />10.00
<br />EP
<br />8+26.92
<br />59,906.84
<br />37,120.94
<br />PC
<br />9+94.21
<br />59,757.91
<br />37,197.15
<br />007-18-57
<br />21.35
<br />167.22
<br />EP
<br />10+15.56
<br />59,738.34
<br />37,205.64
<br />PC
<br />10+22.27
<br />59,732.02
<br />37,207.91
<br />036-11-57
<br />6.32
<br />10.00
<br />PC
<br />10+28.59
<br />59,725.81
<br />37,208.09
<br />015-17-05
<br />169.89
<br />636.84
<br />PC
<br />11+98.48
<br />59,558.41
<br />37,182.25
<br />022-38-57
<br />3.95
<br />10.00
<br />PC
<br />12+02.43
<br />59,554.58
<br />37,181.41
<br />022-10-59
<br />356.05
<br />919.62
<br />PC
<br />15+58.48
<br />59,264.29
<br />36,979.10
<br />019-45-46
<br />3.45
<br />10.00
<br />EP
<br />15+61.93
<br />59,262.36
<br />36,976.26
<br />PC
<br />16+21.41
<br />59,237.91
<br />36,922.03
<br />001-20-27
<br />0.23
<br />10.00
<br />EP
<br />16+21.65
<br />59,237.81
<br />36,921.82
<br />PC
<br />16+35.15
<br />59,232.55
<br />36,909.39
<br />076-56-32
<br />13.43
<br />10.00
<br />EP
<br />16+48.58
<br />59,221.63
<br />36,903.43
<br />
|