My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-10-21_REVISION - M2002118
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2002118
>
2025-10-21_REVISION - M2002118
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2025 9:28:41 AM
Creation date
10/21/2025 10:19:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002118
IBM Index Class Name
Revision
Doc Date
10/21/2025
Doc Name
Notice of Surety Increase
From
DRMS
To
Oldcastle SW Group, Inc. Attn: Sara Weimer
Type & Sequence
SI4
Email Name
AMG
JLE
SMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER RIPPING WORK <br /> Task description: Rip 5 acres <br /> Site: Velarde Pit Permit Action: 2025 Inspection Permit/Job#: M2002118 <br /> PROJECT IDENTIFICATION <br /> Task#: 003 State: Colorado Abbreviation: None <br /> Date: 10/9/2025 County: Huerfano Filename: M118-003 <br /> User: AMG <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D7R DS XR Series II Horsepower: 240 <br /> Ripper Attachment: 3-Shank Ripper Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $97.39 NA <br /> Operating Cost/Hour: $80.69 100 <br /> Ripper Ownership Cost/Hour: $9.58 NA <br /> Ripper Operating Cost/Hour: $5.66 100 <br /> Operator Cost/Hour: $38.02 NA <br /> Total Unit Cost/Hour: $231.34 <br /> Total Fleet Cost/Hour: $231.34 <br /> MATERIAL QUANTITIES Selected estimating method: Area <br /> Alternate Methods: <br /> Seismic: NA Bank Volume: NA BCY NA <br /> Area: 5.00 acres Rip Depth(ft): 1.50 Volume: 12,100 BCY or CCY <br /> Source of estimated quantity: Exhibit L <br /> HOURLY PRODUCTION <br /> Seismic: <br /> Seismic Velocity: NA feet/second <br /> Area: <br /> Average Ripping Depth: 2.45 feet/pass <br /> Average Ripping Width: 6.50 feet/pass <br /> Average Ripping Length: 500.00 feet/pass <br /> Average Dozer Speed: 88.00 feet/minute <br /> Average Maneuver Time: 0.25 minutes/pass <br /> Production per unit area: 0.755 acres/hour <br /> Job Condition Correction Factors <br /> Unadjusted Hourly Unit Production: 0.755 Acres/hr <br /> Site Altitude: 6,100 feet <br /> Altitude Adj: 1.00 (CAT HB) <br /> Job Efficiency: 0.83 (1 shift/day) <br /> Net Correction: 0.83 multiplier <br /> Adjusted Hourly Unit Production: 0.63 Acres/hr <br /> Adjusted Hourly Fleet Production: 0.63 Acres/hr <br /> JOB TIME AND COST <br /> Fleet size: I Grader(s) Total job time: 7.98 Hours <br /> Unit cost: $369.329 Per acre Total job cost: $1,847 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.