Laserfiche WebLink
Scraper Worksheet Cont'd Task#002 Page 1 of 2 <br /> SCRAPER TEAM WORK <br /> Task description: Topsoil 40.5 acres with 0.5 ft <br /> Site: Velarde Pit Permit Action: 2025 Inspection Permit/Job#: M2002118 <br /> PROJECT IDENTIFICATION <br /> Task#: 002 State: Colorado Abbreviation: None <br /> Date: 10/9/2025 County: Huerfano Filename: M118-002 <br /> User: AMG <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COSTShift basis: 1 per day <br /> Equipment Description <br /> -Scraper: Cat 637G <br /> -Dozer: Cat D7R DS XR Series II <br /> Support Equipment-Load Area: NA <br /> -Dump Area: NA <br /> Road Maintenance—Motor Grader: NA <br /> -Water Truck: NA <br /> Cost Breakdown: Scraper Work Team Support Equipment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: 100 20 NA NA NA NA <br /> Ownership cost/hour: $336.56 $97.39 NA NA NA NA <br /> Operating cost/hour: $343.56 $16.14 NA NA NA NA <br /> %Utilization-ripper: NA 0 NA NA NA NA <br /> Ripper own.cost/hour: NA $9.58 NA NA NA NA <br /> Ripper op.cost/hour: NA $0.00 NA NA NA NA <br /> Operator cost/hour: $59.78 $38.02 NA NA NA NA <br /> Unit Subtotals: $739.90 $161.12 NA NA NA NA <br /> Number of Units: 2 1 0 0 0 0 <br /> Group Subtotals: Work: $1,640.92 Support: $0.00 Maint: $0.00 <br /> Total work team cost/hour:$1,640.92 <br /> MATERIAL QUANTITIES <br /> Initial volume: 32,670 CCY Swell factor: 1.215 <br /> Loose volume: 39,694 LCY <br /> Source of estimated volume: 40.5 acres x 6 inches-2025 insp observations and rec plan <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Scraper Bowl(volume)Basis: <br /> Material weight: 1,600 lbs/LCY Struck Volume: 24.00 LCY <br /> Material description: Top Soil Heaped Volume: 34.00 LCY <br /> Rated Payload: 81,600 pounds Average Volume: 29.00 LCY <br /> Payload Capacity: 51.00 LCY Adjusted Capacity: 29.00 LCY <br /> CIRCES Cost Estimating Software <br />