Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br />October 15, 2025 <br /> <br /> <br />Brad Fancher <br />Loveland Ready-Mix Concrete, Inc. <br />644 N. Namaqua Road <br />PO Box 299 <br />Loveland, CO 80539 <br /> <br /> <br />Re: Dunn Pit - File No. M-2021-059 <br /> Loveland Ready-Mix Concrete, Inc. <br /> Technical Revision (TR-1) <br /> Technical Revision for Water Quality Sampling <br /> <br />Dear Brad Fancher: <br /> <br />On October 15, 2025 the Division of Reclamation, Mining and Safety concluded its review of the <br />Technical Revision application submitted to the Division on August 19, 2025, addressing the <br />following: <br /> <br />The Operator has submitted a Technical Revision requesting a reduction in the frequency of water <br />quality monitoring to a semi-annual basis and the number of analytes tested based on the preliminary <br />results. <br /> <br />The decision reached by the Division is: approve. <br /> <br />The terms of Technical Revision No. 1 approved by the Division are hereby incorporated into Permit <br />No. M-2021-059. All other conditions and requirements of Permit No. M-2021-059 remain in full <br />force and effect. <br /> <br /> <br />Bond Held: $398,000.00 <br />Prior Liability: $398,000.00 <br />Change in Liability: $0.00 <br />Revised Liability: $398,000.00 <br />Prior Permit Acreage: 114.25 <br />Change in Permit Acreage: 0.00 <br />Revised Permit Acreage: 114.25 <br />Prior Affected Acreage: 114.25 <br />Change in Affected Acreage: 0.00