My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-10-13_REVISION - P2025011
DRMS
>
Day Forward
>
Revision
>
Prospect
>
P2025011
>
2025-10-13_REVISION - P2025011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2025 10:13:14 AM
Creation date
10/14/2025 9:58:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2025011
IBM Index Class Name
Revision
Doc Date
10/13/2025
Doc Name
Request For Modification
From
Homeland Uranium Corp
To
DRMS
Type & Sequence
MD1
Email Name
HR1
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. Describe proposed surface excavation or other land disturbance, including roads, pits, <br /> trenches,waste piles, drill pads and collar areas of underground workings,ponds, etc. <br /> Up to 35 drilling locations are proposed. Drilling will occur directly on level ground whenever <br /> possible or on a drill pad in the event ground topography requires leveling prior to drill set up. <br /> Drill pad areas will include a wildlife fennad sump to collect cuttings that will he used to hackfill <br /> the drill hole for abandonment. Trenches, approximately 1600 to 1700 sq ft and five feet deep, <br /> will be used at two locations. Eslablislled roads and trails will lie used to access drill areas, <br /> and new access roads are planned to access collar sites (blue trail on all provided maps). <br /> Rubber-tired vehicles will be used for overland travel to minimize surface disturbance. Staging <br /> and laydnwn areas will be estahlishPd as prPsRnted in Figures 6,7 and 8 of original NOI and <br /> Figures 2 and 3 of this amendment. <br /> 6. Proposed Disturbance (approximate) Describe the proposed drilling to be conducted, <br /> including anticipated number of holes, diameter, depth, location, etc. Submit additional <br /> pages if necessary: <br /> A. Drill Pads: <br /> Average Average <br /> Quantity 35 Width (ft) 30 Length (ft) 50 <br /> B. Drill Holes: <br /> Diameter <br /> Quantity 35 Depth (ft) 300-1000 (in) 4.5-5.5 <br /> C. Mud Pits <br /> Average Average Average <br /> Quantity 35 Width (ft) 4 Length (ft) 8 Depth (ft) 5 <br /> D. Described proposed underground work, including reopening of old workings, <br /> advancement of adits or shafts, trenches, pits, cuts, rock dumps, or other types of <br /> disturbance, describe type, quantity and general dimensions: <br /> The proposed project does not include underground work. <br /> l,orfn 2--Public File Page 6 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.