Laserfiche WebLink
SSR Mining CC&V <br />VLF 2 Phase 3B/C Document No: <br />Function: <br />Effective <br />Date: <br />Page No: <br />NA-CCV-SER-SI 2 <br />Backfill <br />S&ER <br />07/15/24 <br />Page 2 of 4 <br />Overburden Fill <br />Zone DRMS Weekly Report <br />3. ACTIVE BACKFILL AREA PHOTOGRAPH: Material pictured on the 9,945 lift was sourced from Schist Island. <br /> <br /> <br />Docusign Envelope ID: 7D5EB83D-EC83-4C4C-AB50-65B47A3C56B6