Laserfiche WebLink
SSR Mining CC&V <br />VLF 2 Phase 3B/C Document No: <br />Function: <br />Effective <br />Date: <br />Page No: <br />NA-CCV-SER-SI 2 <br />Backfill <br />S&ER <br />07/15/24 <br />Page 1 of 4 <br />Overburden Fill <br />Zone DRMS Weekly Report <br /> <br />1. SHIFT REPORTS: <br /> <br />Report Period: <br />Friday-Thursday <br />Ambient Temperature Weather Conditions <br />High Low Precipitation <br />Date: <br />08/22/25 – 08/28/25 73.4 40.9 2’. 7” precipitation <br />measured at CC&V <br /> <br /> <br />Observations & Comments <br />CC&V began compacting the 9,945 low compaction lift. Material was <br />sourced from Globe Hill and Schist Island. <br /> <br />2. AREA OF BACKFILL: The blue area highlights the 9,945 low compaction lift. <br /> <br /> <br /> <br /> <br />Docusign Envelope ID: 61CE2CE6-F8CF-451B-8C74-6C7D921FD08F