Laserfiche WebLink
SSR Mining CC&V <br />VLF 2 Phase 3B/C Document No: <br />Function: <br />Effective <br />Date: <br />Page No: <br />NA-CCV-SER-SI 2 <br />Backfill <br />S&ER <br />07/15/24 <br />Page 1 of 4 <br />Overburden Fill <br />Zone DRMS Weekly Report <br /> <br /> <br /> <br /> <br />1. SHIFT REPORTS: <br /> <br />Report Period: <br />Friday-Thursday <br />Ambient Temperature Weather Conditions <br />High Low Precipitation <br />Date: <br />05/09/25 – 5/15/25 60.5 26.7 .4” precipitation measured <br />at Grassy Valley. <br />0” of snow was recorded in <br />Cripple Creek <br /> <br />Observations & Comments <br />CC&V continued dumping and compacting the 9,875 low compaction lift. <br />Material was sourced from Globe Hill, South Cresson, and Dump1 mining <br />areas. <br /> <br />2. AREA OF BACKFILL: The blue area highlights the 9,875 low compaction lift. <br /> <br />3. <br /> <br /> <br />Docusign Envelope ID: 0509484C-953E-456F-8314-532D9B25CC5A