Laserfiche WebLink
SSR Mining CC&V <br />VLF 2 Phase 3B/C Document No: <br />Function: <br />Effective <br />Date: <br />Page No: <br />NA-CCV-SER-SI 2 <br />Backfill <br />S&ER <br />07/15/24 <br />Page 1 of 4 <br />Overburden Fill <br />Zone DRMS Weekly Report <br /> <br /> <br /> <br /> <br />1. SHIFT REPORTS:. <br /> <br />Report Period: <br />Friday-Thursday <br />Ambient Temperature Weather Conditions <br />High Low Precipitation <br />Date: <br />04/24/25 – 5/01/25 55.7 21.2 0.2” precipitation <br />measured at Grassy Valley. <br />1.1” of snow was recorded <br />in Cripple Creek <br /> <br />Observations & Comments <br />CC&V continued dumping the 9,865 low compaction lift. Good rock and <br />fines were sourced from Globe Hil, Schist 2B, and South Cresson Phase 2. <br />Some oversize material was encountered from the Schist 2B pit and was <br />dumped on the backfill project area. Oversize material was then either <br />broken up or removed from the low compaction backfill area. <br /> <br />2. AREA OF BACKFILL: The Blue area highlights the 9,865 low compaction lift. <br /> <br />3. <br /> <br />Docusign Envelope ID: DECA5C76-76CB-49D7-BA25-21A54484344B