Laserfiche WebLink
SSR Mining CC&V <br />VLF 2 Phase 3B/C Document No: <br />Function: <br />Effective <br />Date: <br />Page No: <br />NA-CCV-SER-SI 2 <br />Backfill <br />S&ER <br />07/15/24 <br />Page 1 of 4 <br />Overburden Fill <br />Zone DRMS Weekly Report <br /> <br /> <br /> <br /> <br />1. SHIFT REPORTS:. <br /> <br />Report Period: <br />Friday-Thursday <br />Ambient Temperature Weather Conditions <br />High Low Precipitation <br />Date: <br />04/18/25 – 4/24/25 50.3 6.4 0.3” precipitation <br />measured at Grassy Valley. <br />5.1 snow was recorded in <br />Cripple Creek on 4-19-25. <br /> <br />Observations & Comments <br />CC&V completed dumping the 9,855 low compaction lift, and began the <br />9,865 low compaction lift. Good rock and fines were sourced from <br />Globe Hil and South Cresson Phase 2. <br /> <br />2. AREA OF BACKFILL: The Blue area highlights the 9,865 low compaction lift. <br /> <br />3. <br /> <br /> <br /> <br />Docusign Envelope ID: DBBFBA38-F169-40FF-B63B-329E4C0FB09C