Laserfiche WebLink
Truck/Loader Worksheet Cont’d Task # A1013 Page 3 of 3 <br /> <br />CIRCES Cost Estimating Software <br />Haul Route: <br />Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />(min) <br />1 10490.00 -6.80 3.00 -3.80 2545 4.339 <br />Haul Time: 4.339 minutes <br />Return Route: <br />Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />(min) <br />1 10490.00 6.80 3.00 9.80 1789 5.987 <br />Return Time: 5.987 minutes <br />Total Truck Cycle Time: 14.158 minutes <br />Loading Tool unit <br />Production <br /> <br />1,605.09 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />1,332.22 <br /> <br />LCY/Hour <br />Truck Unit Production <br />298.35 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />247.63 <br /> <br />LCY/Hour <br /> <br />Optimal No. of Trucks: <br /> <br />5 <br /> <br />Truck(s) <br /> <br />Selected Number of Trucks: <br /> <br />5 <br /> <br />Truck(s) <br />Adjusted hourly truck team production: 1,238.17 LCY/Hour <br />Adjusted single truck/loader team production: 1,238.17 LCY/Hour <br />Adjusted multiple truck/loader team production: 1,238.17 LCY/Hour <br /> <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 61.48 Hours <br /> <br />Unit cost: <br /> <br />$2.662 <br /> <br />/LCY <br /> <br />Total job cost: <br /> <br />$202,623 <br />