Laserfiche WebLink
ENERAL NOTE <br />m <br />0 <br />a <br />I� <br />0 <br />0 <br />U <br />E <br />C <br />N <br />LO <br />0 <br />N <br />N <br />N <br />4 <br />O <br />x <br />W <br />w <br />a <br />Z <br />g <br />a <br />a <br />0 <br />0 <br />U_ <br />x <br />i <br />a <br />w <br />rn � <br />3 J <br />o <br />v �c <br />� o <br />� u <br />o <br />'o a <br />00 <br />U � <br />� u <br />in <br />71"j 1-0 1 <br />01 <br />• Iii '�j <br />�II <br />., 1. - If <br />(A(HF I A <br />'•V <br />0 150 300 <br />( IN FEET) <br />1 INCH = 150 FEET <br />LEGEND: <br />PROPOSED MAJOR CONTOUR 4820--- <br />PROPOSED MINOR CONTOUR - - 18 <br />EXISTING CONTOUR - - - -5013- - - - <br />EXISTING RIGHT OF WAY - - <br />PERMIT BOUNDARY �� ••�••� <br />SURFACE WATER ----- - - - ---- <br />��-,�. EFFECTIVE 100 YEAR FLOODWAY ---- EF-Fw------.y_..n <br />EFFECTIVE 100 YEAR FLOODPLAIN --- -- - -EF-FP --- <br />FRENCH DRAIN <br />• `�'� \�' ��. PAVED ROAD AREA <br />RESERVIOR LINER NOTES <br />1. PRIOR TO CONSTRUCTION, OVERBURDEN AND CLAYSTONE MATERIAL TESTING <br />SHALL BE PERFORMED FOR USE IN FINAL DESIGN. THE FOLLOWING SPECIFICATIONS <br />AND PROCEDURES ARE PROVIDED AS A GENERAL GUIDELINE FOR PERMITTING <br />PURPOSES. FINAL SPECIFICATIONS AND DESIGN CRITERIA WILL BE DEVELOPED <br />�l DURING THE FINAL DESIGN PROCESS. <br />2. EACH LAYER OF FILL SHALL BE SCARIFIED TO ALLOW PROPER BONDING BETWEEN <br />LAYERS. <br />/ 3. DENSITY AND MOISTURE CONTENT TESTING SHALL BE PERFORMED AT A RATE OF 1 <br />(ONE) TEST FOR EACH 2,000 YARDS PLACED. <br />EFFECTIVE F <br />100 YEAR 4. ALL CLAY LINER MATERIAL SHALL BE COMPACTED TO A MINIMUM 95% ASTM-D698-78 <br />FLOODWAY STANDARD PROCTOR AT +2% OF OPTIMUM MOISTURE CONTENT. <br />5. NO LINER MATERIAL SHALL BE PLACED IN THE LINER SLOPE WHILE EITHER THE <br />MATERIAL, EMBANKMENT, OR FOUNDATION IS FROZEN AND NO ORGANIC MATERIAL <br />SHALL BE PLACED IN THE LINER SLOPE. <br />EFFECTIVE <br />100 YEAR 6. EACH LAYER OR LIFT SHALL BE CONSTRUCTED CONTINUOUSLY AND <br />FLOODPLAIN APPROXIMATELY HORIZONTAL FOR THE WIDTH AND LENGTH OF EACH LIFT. <br />7. LINER MATERIAL SHALL BE COMPOSED OF CLAYEY OVERBURDEN AND WEATHERED <br />CLAYSTONE THAT BREAKS DOWN DURING PROCESSING. BEDROCK MATERIAL SHALL <br />BE RIPPED, MOISTURE TREATED, AND ALLOWED TO AIR SLAKE FOR A MINIMUM OF <br />t ONE DAY PRIOR TO ITS PLACEMENT IN THE LINER. ALL BEDROCK MATERIAL SHALL <br />HAVE A MINIMUM OF 75% PASS THE US STANDARD 200 SIEVE PRIOR TO PLACEMENT <br />l _ IN THE EMBANKMENT. <br />m 8. THE CLAY LINER MATERIAL SHALL BE MIXED IN THE EMBANKMENT AT THE RATIO OF <br />4 (FOUR) PARTS CLAY OVERBURDEN TO I (ONE) PART SHALE BEDROCK MATERIAL. <br />-o <br />9. LINER MATERIAL SHALL BE PLACED IN A 9-INCH (MAXIMUM) LOOSE LIFT PRIOR TO <br />COMPACTION. <br />10. A CATERPILLAR 815 OR 825 SHEEPSFOOT COMPACTOR ( EQUIVALENT) UIVALENT SHALL BE <br />�- USED FOR COMPACTING EFFORTS. <br />11. THE COMPLETED LINER SHALL BE PROTECTED FROM DAMAGE CAUSED BY <br />DESICCATION OR FREEZING TEMPERATURES BY PLACING RANDOM FILL OR A <br />MINIMUM OF 12-INCHES PIT RUN MATERIAL ON THE ENTIRE SLOPE. ALL RANDOM FILL <br />TO BE PLACED WITH A MAXIMUM 9-INCH LOOSE LIFT AND COMPACTED TO A <br />P <br />MINIMUM OF 95% ASTM-D698-78 STANDARD PROCTOR. <br />X 12. ALL WEATHERED BEDROCK TO BE EXCAVATED AND REMOVED FROM THE CLAY <br />LINER FOUNDATION. WEATHERED BEDROCK SHALL BE REMOVED UNTIL COMPETENT <br />f BEDROCK (AS DETERMINED BY THE ONSITE ENGINEER) IS EXPOSED. THE BEDROCK <br />I k i SHALL THEN BE SCARIFIED PRIOR TO THE PLACEMENT OF FILL MATERIAL. <br />Ir <br />I PX{ FLOODWAY DIVERSION BERM NOTES: <br />P 1. BERM LOCATION AND ALIGNMENT MAY BE SHIFTED NORTH AS NEEDED WITHOUT <br />I _ FLOODWAY IMPACT. <br />2. BERM ELEVATION MAY BE HIGHER THAN INDICATED IF EXTRA OVERBURDEN <br />I MATERIALS ARE AVAILABLE. <br />I <br />X 3. BERM WIDTH MAY BE WIDER THAN INDICATED WITHOUT FLOODWAY IMPACT IF <br />ELEVATION IS NOT ABOVE EXISTING GROUND ELEVATION TO THE SOUTH. <br />i <br />IX <br />I -- <br />� !I <br />1 <br />X <br />-EX <br />ti <br />� 4 <br />+f X <br />+ I <br />� � A <br />1 � � <br />GRIADE G <br />1 <br />r <br />>< <br />P <br />P <br />P <br />I <br />l <br />r <br />RECHARGE POND 3+_Il;p <br />1 <br />5. 0' (MIN.) <br />••Io: <br />W <br />10, 0, <br />RSION BE <br />1. THIS TIMNATH CONNELL PIT AMENDMENT PROPOSES TO CHANGE THE RECLAMATION <br />PLAN TO INCLUDE OPPORTUNITIES FOR FUTURE DEVELOPMENT CONSISTENT WITH <br />THE ESTABLISHED TIMNATH ZONING DISTRICT AND THE PROPERTY OWNER <br />PREFERENCES. THE AMENDMENT APPLICATION FORM INCLUDES A COMBINATION OF <br />DEVELOPED WATER RESOURCES, INDUSTRIAL/COMMERCIAL, AND RESIDENTIAL <br />POST -MINING LAND USES. FINAL RECLAMATION PROPOSES CREATION OF STABLE <br />LANDFORMS TO SUPPORT THE ZONING DISTRICT ALLOWABLE LAND USES. THIS <br />COMBINATION OF MINED LAND RECLAMATION BOARD (MLRB) FINAL LAND USES <br />WILL ALLOW FUTURE DEVELOPMENT OF THE PROPERTY CONSISTENT WITH THE <br />CURRENT TOWN OF TIMNATH ZONING DISTRICT, REGIONAL COMMERCIAL (RC). THE <br />REGIONAL COMMERCIAL ZONING DISTRICT INCLUDES REGIONAL COMMERCIAL USES <br />SUCH AS LARGE RETAIL ESTABLISHMENTS, BUSINESS AND LIGHT INDUSTRIAL USES, <br />MEDICAL FACILITIES AND OFFICES, HIGHER DENSITY MULTI -FAMILY RESIDENTIAL, <br />AND A CONTINUUM OF LIFE -CARE HOUSING OPTIONS. <br />2. PHASE I MINING IS COMPLETE. THE PHASE I MINING AREA IS TO BE RECLAIMED WITH <br />A COMBINATION OF BELOW -GRADE LINED RESERVOIR, RECHARGE PONDS, AND <br />COMPACTED BACKFILL. THE RESERVOIR LINER CONSTRUCTION HAS BEEN <br />COMPLETED ON THE WEST AND SOUTH SIDES OF THE MINING AREA. <br />3. PHASE 2 MINING IS COMPLETE. THE PHASE 2 MINING AREA HAS BEEN BACKFILLED, <br />COMPACTED, GRADED, AND SEEDED FOR REVEGETATION. SEEDING WAS <br />ACCOMPLISHED WITH THE PREVIOUSLY APPROVED RECLAMATION SEED MIX. THE <br />WEITZEL ROAD EXTENSION HAS BEEN CONSTRUCTED AND THE ROAD AND <br />RIGHT-OF-WAY HAVE BEEN RELEASED FROM THE PERMIT AREA. THE RELOCATED <br />BOX ELDER DITCH HAS ALSO BEEN CONSTRUCTED IN THE PHASE 2 MINING AREA. <br />4. RECLAMATION WILL GENERALLY INCLUDE BACKFILLING, COMPACTING, GRADING, <br />AND STABILIZATION OF AREAS PLANNED FOR FURTHER DEVELOPMENT FOLLOWING <br />RELEASE FROM THE MLRB RECLAMATION PERMIT. MANY OF THE MINING AREAS <br />HAVE BEEN, OR WILL BE, BACKFILLED TO ACCOMMODATE FUTURE <br />INDUSTRIAL/COMMERCIAL OR RESIDENTIAL DEVELOPMENT BY PLACING <br />STRUCTURAL OR OTHER APPROPRIATE FILL MATERIAL, COMPACTING FOR FUTURE <br />STABILITY, AND GRADING FOR DEVELOPMENT NEEDS SUCH AS STORMWATER SEWER <br />DESIGN AND CONSTRUCTION. <br />5. AREAS OF PHASE I AND PHASE 2 THAT HAVE ALREADY BEEN BACKFILLED, <br />COMPACTED, TOPSOILED, GRADED, AND SEEDED HAVE BEEN PLANTED WITH THE <br />PREVIOUSLY APPROVED GRASS SEED MIX BELOW. <br />Timnath Connell Pit Approved <br />Revegetation Seed Mix <br />Grass Species <br />Rate <br />(lbs PLS/acre) <br />eatgrass, <br />Thinspike <br />5.5 <br />Grama, Sideoats <br />2.5 <br />Switchgrass <br />1.5 <br />TOTAL <br />9.5 <br />Rates are for drill seeding. If broadcast <br />seeding is used, double seeding rates. <br />6. ALL AVAILABLE TOPSOIL AND OVERBURDEN MATERIAL WILL BE USED FOR <br />RECLAMATION. <br />7. SOME AREAS DISTURBED BY MINING ACTIVITIES WILL BE PREPARED WITH TOPSOIL <br />AND REVEGETATED DURING RECLAMATION. ALTERNATIVELY, AREAS PLANNED FOR <br />MORE IMMEDIATE MLRB PERMIT RELEASE AND DEVELOPMENT MAY BE BACKFILLED, <br />COMPACTED, AND COVERED WITH SUITABLE SOIL STABILIZING MATERIAL SUCH AS <br />HYDRO -MULCH, SOIL TACKIFIER, OR A LAYER OF ROCK TO MEET PERMIT RELEASE <br />REQUIREMENTS. <br />8. IF REVEGETATION OCCURS, IT WILL GENERATE A BLEND OF FAST GROWING, <br />STABILIZING, GRASS SPECIES AND, GIVEN SUITABLE PRECIPITATION, SHOULD <br />PRODUCE GOOD VEGETATION COVER OVER MUCH OF THE REVEGETATED AREA. <br />ALTHOUGH MINE PITS WILL BE BACKFILLED, COMPACTED, AND GRADED TO BLEND <br />INTO THE ADJACENT TOPOGRAPHY AND PROVIDE FUTURE DEVELOPMENT NEEDS, NO <br />SLOPES WILL BE RECLAIMED ANY STEEPER THAN 3H:IV. <br />8. THE NEW PROPOSED FAST GROWING, STABILIZING SEED MIXTURE FOR FUTURE <br />REVEGETATION IS PROVIDED BELOW. <br />Timnath Connell Pit Amendment <br />Proposed Revegetation Seed Mix <br />Grass Species <br />Rate <br />(lbs PLS/acre) <br />nterme late <br />Wheatgrass <br />5 <br />Blue Grama <br />1 <br />Triticale <br />1.25 <br />TOTAL <br />7.25 <br />Rates are for broadcast seeding. <br />9. PERIODIC INSPECTION FOR NOXIOUS WEEDS, AT LEAST ONCE A YEAR EARLY IN THE <br />SEASON, WILL BE DONE AS PART OF A WEED MANAGEMENT PLAN. <br />10. BEST MANAGEMENT PRACTICES WILL BE USED TO CONTROL EROSION AND <br />STORMWATER SUSPENDED SEDIMENT RUNOFF FROM THE SITE DURING <br />RECLAMATION ACTIVITIES. <br />15' <br />RANDOM FILL <br />�\ \ �CtSM0AbTE' 6 \ j -CLAY LINER V �, � 0.5 1 <br />5.0 (MIN.) <br />10.0' <br />RESERVOIR LINER <br />MINE PIT <br />FUTURE BELOW -GRAD RESERVOIR <br />ROSS SECTION <br />FRENCH <br />DRAIN <br />0 <br />UNDISTURBED <br />SAND & GRAVEL <br />WATER COLLECT <br />PERMIT <br />BOUNDARY <br />6. 0' - 8'. 0' <br />N <br />1,- <br />O <br />.- <br />N <br />N <br />N <br />M <br />N <br />fit' <br />N <br />0 <br />N <br />�- <br />CO <br />CO <br />N <br />O <br />N <br />(0 <br />0) <br />0) <br />o <br />d <br />0 <br />0 <br />0 <br />t- <br />0 <br />W <br />O_ <br />(W <br />> <br />•Q) <br />�000� <br />N <br />Z <br />(0 <br />Z <br />n <br />Z <br />W <br />-1 <br />W <br />J <br />W <br />(n <br />(n <br />07 <br />W <br />W <br />U) <br />0Y <br />� <br />W <br />co <br />C <br />< <br />W <br />F- <br />< <br />IY <br />J <br />.J <br />J <br />U <br />Z <br />Q <br />Q <br />Q <br />Q <br />Q <br />W <br />Q <br />o <br />z <br />= <br />W <br />z <br />2 <br />W <br />Z <br />M <br />W <br />a <br />F- <br />cc <br />Q <br />Z <br />W <br />Q <br />F- <br />it <br />Q <br />F- <br />F- <br />F- <br />0- <br />Q <br />M <br />Z <br />N <br />N <br />U tO <br />o <br />0 <br />13 <br />0 <br />: `0 <br />� U <br />�04 <br />W m0 0 <br />0 <br />amRUi <br />J <br />W <br />z <br />z <br />0 <br />U <br />F' <br />Q <br />z <br />2 <br />F_ <br />I� <br />U) <br />W <br />0 <br />L.J.. <br />D <br />O <br />U) <br />W <br />_i <br />W <br />z <br />z <br />O <br />U <br />Q <br />0 <br />O <br />0 <br />U <br />W <br />J <br />CL <br />z <br />LjL <br />CL <br />-o <br />X <br />W <br />Q <br />O <br />Uj <br />E <br />® rymom <br />W <br />0-0 <br />CID CV o C <br />a' <br />a' <br />C� ) <br />co <br />O <br />O <br />U <br />Date: <br />APRIL 2025 <br />Job No: <br />590-004 <br />Drawn: <br />M. MOKVYTS <br />Design: <br />M. MOKVYTS <br />Checked: B. <br />SCHENDERLEIN <br />Scale: <br />1 " = 150' <br />Sheet: <br />H <br />NOT TO SCALE <br />Of. <br />