Laserfiche WebLink
LISTS OF OTHER PERMITS AND LICENSES REQUIRED EXHIBIT <br /> F <br /> The following permits are needed for the site: <br /> 1)County (special use)approval - Delta County Planning office has already approved the <br /> application as an extension of the existing 8.43 acre pit(Farnsworth#2 Pit). <br /> 2)No fugitive air emissions permit is needed since the site will mine less than 70,000 tons per year <br /> and the operation will be wet in nature. Also, all processing will be done on the existing River <br /> Bottom Pit immediately north of the river from this location. An APEN form has been filed with <br /> CDPHE Air Quality Control to verify that the emissions are low enough that a permit is not <br /> needed. <br /> 3)An application is being filed with the Division of Water Resources for a Gravel Well Permit to <br /> allow for pit pumping and lake evaporation once the site is reclaimed. This permit includes an <br /> augmentation plan and substitute water supply plan for the evaporation from the lake. <br /> 41)A State Highway access permit is not needed since the material sold from this operation will be <br /> brought to market by truck using the existing access for the River Bottom Pit on State Highway <br /> 133. There will not be increased traffic on the road while the North Fork Pit is mined. The <br /> Farnsworth#2 Pit will not sell any material while United is active on the site. <br /> 5)The discussions, with the USACE, concerning the intended bridge across the river have been <br /> stopped since the bridge planned has been deleted from the plan. No reclamation will be <br /> necessary where the bridge would have been. <br /> 35 <br /> North Fork Pit March 04 <br /> 1 <br />