Laserfiche WebLink
7. Mining Timetable <br /> Mining of the 8.45 acre disturbed area will be mined depending on equipment, weather and gravel <br /> demand. Assuming mining starts in June of 2004, reclamation would be completed shortly after <br /> the discontinuation of mining. <br /> The following timetable is a best estimate of the sequence of operations for the life of the mine: <br /> Task # Description Time Needed <br /> 1 Strip Topsoil and Construct Berms 0.25 <br /> mos. <br /> 2 Move in Plant Equipment, Set Up Operation 0.5 month <br /> 3 Excavate gravel unknown <br /> 4 Remove mining equipment and sell mined material unknown <br /> 5 Replace topsoil on disturbed area 0.5 months <br /> 6 Reseed upper areas 0.25 months <br /> 8. Schedule of Operations <br /> Mining operations may occur year-round but will normally occur from April through November. <br /> The operator will not have night gravel mining operations, although minor truck activity may <br /> occur after hours. The operation may be active from 7 am through 7 pm Monday through Saturday. <br /> 24 <br /> North Fork Pit March 04 <br />