My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-09-26_REVISION - M2004025 (5)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2004025
>
2025-09-26_REVISION - M2004025 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2025 3:25:29 PM
Creation date
9/29/2025 8:19:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004025
IBM Index Class Name
Revision
Doc Date
9/26/2025
Doc Name
Request for Technical Revision
From
Farnsworth Construction and Gravel Company
To
DRMS
Type & Sequence
TR2
Email Name
RDZ
AME
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> y COLORADO DIVISION OF RECLAMATION, MINING A Y <br /> *, e"1 1313 Sherman Street,Room 215,Denver,Colorado 80203 ph(303)866-3567E1VED <br /> SLP Z b ZUZ5 <br /> REQUEST FOR TECHNICAL REVISION (TR)COVER SHEET <br /> Colorado Division of Reclamation, <br /> Mining and Saftey <br /> File No.: M-,2p40 5/ DZ 5 Site Name:AJC f j' T <br /> County Da L-7i4 TR# (DRMS Use only) <br /> Permittee: F.q- .e n) S LA-) ,n R -71-4 .✓.5 TR GE.c. Ti 7` �s— u�/ C <br /> Operator(If Other than Permittee): <br /> Permittee Representative:f.4' ,4 rC...i A 141 .e A 5 Lei /2 -77_›(.. <br /> Please provide a brief description of the proposed revision: /4,Q — l 1 �P - rerhu c r�. <br /> (ACL-r) e d X cd iiJ //y c- fki,lea - <br /> As defined by the Minerals Rules, a Technical Revision(TR) is:"a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR,you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies,the Division must deny the TR unless the <br /> permittee requests additional time, in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request,including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type- Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted(mark only one) <br /> 11Oc, Ill, 112 construction <br /> materials, and 112 quarries $216 1�1 <br /> 112 hard rock(not DMO) $175 <br /> 110d, 112d(1,2 or 3) $1006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.