Laserfiche WebLink
-4- <br /> 12. Prima t future(Post-mining) land use(check one): <br /> Cropland(CR) _D Pastureland(PL) J I General Agriculture(GA) <br /> _1j Rangeland(RL) Forestry(FR) ..w. Wildlife Habitat(WL) <br /> nResidential(RS) Recreation(RC) — Industrial/Commercial(IC) <br /> Developed Water Resources(WR) JJ Solid Waste Disposal(WD) <br /> I.,. Primary present land use(check one : — <br /> 1 Cropland(CR) Pastureland(PL) General Agriculture(GA) <br /> Rangeland(RL) Forestry(FR) — Wildlife Habitat(WL) <br /> � <br /> Residential(RS) Recreation(RC) : Industrial/Commercial(IC) <br /> Developed Water Resources(WR) <br /> 14. Method of Mining: Briefly explain mining method(e.g.truck/shovel): <br /> Material will be extracted using front end loaders. <br /> 15. On Site Processing: 111 Crushing/Screening <br /> 13.1 Briefly explain mining method(e. .truck/shovel): <br /> Excavation will be performed by front end loaders which will remove and haul the raw resource to <br /> n nrnnne.ninn nlnn+ nnrl will einne+e.;+♦Inn mn+nrinl in n ni iron 'Nan A frnn4 noel Innrinr mill rinnnni} <br /> List any designated chemicals or acid-producing materials to be used or stored within permit area: <br /> No designated chemicals or acid-producing materials will be used or stored within the permit area. <br /> 16. Description of Amendment or Conversion: <br /> If you are amending or converting an existing operation,provide a brief narrative describing the proposed change(s). <br /> This amendment adds acreage to the current permit boundary. <br />