My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-09-18_HYDROLOGY - M1999034
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1999034
>
2025-09-18_HYDROLOGY - M1999034
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2025 10:11:23 AM
Creation date
9/22/2025 9:09:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999034
IBM Index Class Name
Hydrology
Doc Date
9/18/2025
Doc Name
Substitute Water Supply Plan
From
Division of Water Resources
To
DRMS
Email Name
NCG
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Holcim South Platte Combined SWSP September 18, 2025 <br /> Plan IDs 3614, 4773, 3624, 4772, 4616, 3437, 3376, 3650, 3668, 5475, 5829, &t 6243 Page 27 of <br /> 37 <br /> Proposed DRMS <br /> Site Name Final Bond Comments <br /> Amount Approach <br /> Reclamation No. <br /> Backfilling of all post-81 areas in progress. <br /> Jeronimus Pit Backfilled $1,510,800 1, 4 Water rights dedicated via February 29, <br /> 2012 affidavit. <br /> The site has been lined with a slurry wall <br /> (WDID 0203381). This site has received a <br /> Hazeltine Pit Lined Reservoir $0 3 <br /> full surety release. Additional SWSPs will be <br /> required until the applicant/landowner has <br /> replaced all of the remaining lagged <br /> depletions. <br /> Bonded for lining. The south and central <br /> reservoirs are lined with a slurry wall (WDID <br /> 0203385) and have obtained SEO liner <br /> approval. A bond reduction was approved <br /> Lined by DRMS. The applicant is in the process of <br /> Brighton Pit Reservoir/Lakes $150,000 1, 3 backfilling the remaining exposed <br /> groundwater areas. Once backfilling is <br /> complete, additional SWSPs will be required <br /> until the applicant has replaced all of the <br /> remaining lagged depletions. <br /> Tucson South The financial warranty was reviewed as part <br /> Pit <br /> Lined Reservoir $834,000 3 of an inspection and the bond was <br /> decreased. <br /> Wattenberg Lined Reservoir $9,944 Bonded for lining. Pit lined in 2013 and <br /> Pit 508 3 received SEO liner approval in 2019 <br /> Platte Valley Groundwater $8,900,000 1, 4 Bonded for backfilling. Water rights <br /> Pit Lake dedicated via February 29, 2012 affidavit. <br /> DPG Pit Groundwater $5,426,609 3 Bonded for lining. <br /> Lake <br /> Distel Pit Groundwater $1,216,716 1, 2 Bonded for backfilling. Lagged and future <br /> Lake depletions from evaporation and <br /> consumptive use by wetlands vegetation at <br />
The URL can be used to link to this page
Your browser does not support the video tag.