Laserfiche WebLink
Holcim South Platte Combined SWSP September 18, 2025 <br /> Plan IDs 3614, 4773, 3624, 4772, 4616, 3437, 3376, 3650, 3668, 5475, 5829, &t 6243 Page 13 of <br /> 37 <br /> 1996CW658, all GIC direct flow deliveries incur an immediate surface return flow obligation <br /> of 23.7%, and all Fossil Creek deliveries incur an immediate surface return flow obligation of <br /> 20.1%. The estimated consumptive use credit is therefore 15.50 acre-feet per share for GIC <br /> direct flow water, and 0.95 acre-feet per share for Fossil Creek Reservoir water. For the <br /> purposes of this SWSP, Holcim is assuming that the GIC's 60 preferred rights in Fossil Creek <br /> Reservoir will not be available to GIC during WY2025. Excluding the Fossil Creek Reservoir <br /> component of the GIC deliveries, the projected farm headgate delivery of the 3 shares will <br /> equal 60.93 acre-feet per year (3 shares x 20.31 acre-feet/share), with a return flow <br /> obligation of 27.60 acre-feet. The total consumptive use credit for the 3 shares is therefore <br /> projected to equal 33.33 acre-feet for 2025. <br /> The GIC shares will be delivered back to the river through the 23rd Avenue and Fourth Street <br /> Return Station. <br /> Bucklen Equipment Company Lease <br /> The Applicant executed an agreement with Bucklen Equipment Co., Inc. for the lease of <br /> excess augmentation credits from the Bucklen Pit SWSP (WDID 0302538) during the period of <br /> April through October 2025. A copy of the lease, dated November 18, 2024, is attached. The <br /> excess augmentation credits will be generated from six (6) Greeley Irrigation Company <br /> shares owned by the Bucklen Equipment Co., Inc. The return flow obligations associated <br /> with the use of the six Bucklen GIC shares are counted as a depletion in and will be replaced <br /> under the Bucklen Pit SWSP. After use in the Bucklen Pit SWSP, the shares are projected to <br /> produce a total of 70.70 acre-feet of excess credits during the 2025 irrigation season. <br /> According to the agreement, Bucklen Equipment Co. will lease to Holcim as needed any <br /> excess augmentation credit available during the 2025 irrigation season for use. The Bucklen <br /> GIC shares will be delivered to the Cache la Poudre River at the 23rd Avenue and Fourth <br /> Street Return Station (WDID 0302318). <br /> City of Greeley Lease <br /> Holcim has entered into a water lease agreement with the City of Greeley under which <br /> Greeley will provide a total of 36 acre-feet of fully consumable water for replacement <br /> purposes in April and October 2025. A copy of the lease agreement, dated February 3, 2025, <br /> is attached. The water is discharged to the Cache la Poudre River from the City's <br /> wastewater treatment plant. <br />