My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-09-17_REVISION - M1994081
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1994081
>
2025-09-17_REVISION - M1994081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2025 8:48:32 AM
Creation date
9/18/2025 11:43:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994081
IBM Index Class Name
Revision
Doc Date
9/17/2025
Doc Name
Adequacy Review Response
From
Mortensen's Landscape & Irrigation, LLC
To
DRMS
Email Name
CMG
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
We began our mining operations where the previous operator had left off. We are currently <br />working westward through Area 1. At our current rate of mining and removal of materials, we <br />anticipate approximately seven to ten years before reaching the edge of Area 9. When Importation of <br />Inert Materials is available, we will begin stockpiling backfill material on the eastern side of Area 1 and <br />work westward as well, backfilling concurrently with mining, and preparing for reclamation in the <br />same direction. We plan on only disturbing one Area at a time, keeping within the regulations of only <br />disturbing 10 acre sections at a time. <br />After mining, backfilling and reclamation of Area 1 is completed, we will begin mining on the <br />eastern side of Area 9 and continue to work westward. Again, this is estimated to take approximately 10 <br />years at our current rate. If our demand for materials increases, and mining operations proceed quicker <br />than currently estimated, we will update our Mining Plan. <br />Rule 6.4.45 – Exhibit E – Reclamation Plan: <br />Weed survey and chemical treatment was conducted April 14, 15 and 16, 2025 by a Qualified <br />Supervisor and Certified Applicator. We will submit the invoice from this treatment as soon as possible, <br />but are currently awaiting a duplicate from the applicator. <br />This concludes the Operator's responses to the Preliminary Adequacy Review of TR-2. <br />Brandon Garrison <br />Operations Manager <br />Mortensen's Landscape & Irrigation <br />(719) 580-7006
The URL can be used to link to this page
Your browser does not support the video tag.