Laserfiche WebLink
<br /> <br />1313 Sherman St. Room 215 Denver, CO 80203 P (303) 866-3567 F (303) 832-8106 https://drms.colorado.gov <br />Jared Polis, Governor | Dan Gibbs, Executive Director | Michael A. Cunningham, Director <br />September 16, 2025 <br /> <br /> <br />Marcelo Calle <br />Office of Surface Mining <br />Western Region <br />One Federal Center, Building 41 <br />PO Box 25065 <br />Denver, CO 80225 <br /> <br /> <br />Re: Deserado Mine (Permit No. C-1981-018) <br /> Technical Revision Application No. 75 (TR-75) <br /> TR-75 Slurry Line Injection System <br /> <br /> <br />Dear Sir or Madam: <br /> <br />The Division of Reclamation, Mining and Safety hereby issues notice, in accordance with Title 34, <br />Article 33, Section 118, Paragraph 3, of the Colorado Revised Statutes, that on September 16, 2025, <br />an application to revise coal mining operations at the Deserado Mine was considered complete for <br />the purposes of filing. All review and comment periods as provided in the Act and the Regulations <br />initiate from this date of filing. <br /> <br />Deserado Mine is requesting permission to construct and operate a slurry injection system to backfill <br />mined out workings. The applicant is not proposing additional surface disturbance outside of the <br />area currently approved for disturbance. <br /> <br />The underground coal mining operation is on land located approximately 7 miles Northeast of <br />Rangely, Colorado. The permit area is further described as follows: <br /> <br />Portions of Sections 1, 2, 3, 4, 10, 11, and 12, T2N, R101W, 6th PM, all in Rio Blanco County; <br />Portions of Sections 17, 18, 19, 20, 21, 23, 25, 26, 27, 28, 30, 31, 34, 35, and 36, T3N, R101W, 6th <br />PM; All of Sections 22, 29, 32, and 33, T3N, R101W, 6th PM, all in Rio Blanco County. <br /> <br />The above-mentioned tracts of land are shown on the following USGS 7.5 minute Quadrangle <br />map(s): Rangely Ne. <br /> <br />This application as submitted may not constitute a Mining Plan Action. If the proposal is <br />significantly changed during our review process, we will consult with you on whether a Mining Plan