Laserfiche WebLink
Appendix C3 <br /> Colona Pit <br /> Full Build Out Operations Lagged Depletions Analysis <br /> URF Inverted URF Full Build Out Operations Lagged Depletions <br /> Depletions Lagged Depletions <br /> 1 0.12 12 0.03 (AF) (AF <br /> 2 0.25 11 0.03 Year Month A B <br /> 3 0.15 10 0.04 January 2.9 <br /> 4 0.10 9 0.04 February 2.9 <br /> 5 0.08 8 0.05 March 6.4 <br /> 6 0.07 7 0.06 April 9.4 <br /> 7 0.06 6 0:07 May 11.9 <br /> 8 0.05 5 0.08 0 June 14.7 <br /> 9 0.04 4 0.10 July 14.2 <br /> 10 0.04 3 0.15 August 12.5 <br /> 11 0.03 2 0.25 September 9.6 <br /> 12 0.03 1 0.12 October 7.5 <br /> November 5.0 <br /> Notes: December 2.9 <br /> (1)See Appendix C1 for Colona Pit Unit Response Function January 2.9 6.8 <br /> (2)Year 0 depletions values assumed to equal full build out operations monthly February 2.9 6.2 <br /> depletions proposed under this SWSP. March 6.4 6.0 <br /> April 9.4 6.7 <br /> May 11.9 7.8 <br /> 1 June 14.7 9.0 <br /> July 14.2 10.1 <br /> August 12.5 10.6 <br /> September 9.6 10.4 <br /> October 7.5 9.7 <br /> November 5.0 8.8 <br /> December 2.9 7.8 <br /> January 2.9 6.8 <br /> -February 2.9 6.2 <br /> March 6.4 6.0 <br /> April 9.4 6.7 <br /> May 11.9 7.8 <br /> 2 June 14.7 9.0 <br /> July 14.2 10.1 <br /> August 12.5 10.6 <br /> September 9.6 10.4 <br /> October 7.5 9.7 <br /> November 5.0 8.8 <br /> December 1 2.9 7.8 <br /> SWSP Period Total 199.7 199.7 <br /> P:\061-052\000-Colona\swsp\2025 SWSP Renewal\Tables\ Wright Water Engineers,Inc. DES:JBH <br /> Colona 2025 SWSP tables 1-8.xlsx 6/9/2025 CH K:PR F <br />