My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NS 2023 Annual Report For EPA
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M1983194
>
NS 2023 Annual Report For EPA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2025 9:21:26 AM
Creation date
9/9/2025 9:13:42 AM
Metadata
Fields
Template:
DRMS Permit Index
IBM Index Class Name
Hydrology
Doc Date
8/28/2025
Archive
No
Tags
Unknown Indexing
Description:
Use tag when unsure of document indexing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Natural Soda LLC 2023 Project Status Report & Annual Plan of Development <br /> 23 January 2024 <br /> <br />4.4. Geotechnical Program (Geophysical Logging) <br />4.4.1. Subsurface Subsidence Geophysical Logging <br />NS conducted the EPA mandated subsurface subsidence logging in the 15H-SSMW <br />well July 2023, the analysis indicated no subsurface subsidence to the depth of 1,750. <br />The 15H-SSMW serves as the subsidence monitor well for the 15H and 16H west <br />mining intervals. <br />• NS conducted routine, EPA mandated subsurface subsidence logging in their <br />15H-SSMW well on July 14, 2023. This well serves as the SSMW for the <br />western portions of the 15H and 16H mining intervals. This SSMW log was <br />compared to the baseline SSMW log (July 9, 2016) and indicated no <br />subsurface subsidence to the log total depth of 1,750 feet measured depth <br />below ground level (MD GL). <br />• DRG & Associates, Inc. conducted routine EPA mandated Surface <br />Subsidence Monuments (SSMs) biennial surveys on June 20th, 2023. <br />Results were reported to the EPA on July 5, 2023. <br />4.4.2. Surface Subsidence Monitoring <br />A surface subsidence monument (SSM) survey of all monuments above NS’s area of <br />operations was conducted in the second quarter of 2023. Results of the 2023 SSM <br />survey are shown in Table 5 below, and survey results were reported to the EPA July <br />2023. The next planed SSM survey will be conducted in the second quarter of 2025. <br />In 2024 a new SSM will be installed above the 18H west mining interval that will be <br />drilled and completed during the spring/summer of 2024.
The URL can be used to link to this page
Your browser does not support the video tag.